Laserfiche WebLink
;` nti, • • CHy of Santa Ana <br />On -Call Traffic Engineering <br />DAVID R. ANDERSON, <br />Mr. Dave Anderson brings 32 years of civil engineering experience. He <br />P.E. <br />has served -as Project Manager or Principal -in -Charge on several major <br />Senior Vice PresidenU <br />multi -discipline public works projects. His engineering experience has <br />Regional Manager <br />included conceptual and advanced planning, PS&E, and construction <br />management of streets and roads, railroad and highway bridges, drainage <br />PRINCIPAL -IN -CHARGE <br />and flood control, water and wastewater, transportation planning, toll <br />facilities, and assessment engineering. As Senior Vice President and <br />Education <br />Regional Manager for Willdan, Mr. Anderson is ultimately responsible for <br />B.S., Civil Engineering <br />the quality and timely delivery of a wide variety of projects involving the <br />Professional Registration <br />resources of Willdan's full service capabilities. During his career, Mr. <br />California No. CE 45458 <br />Anderson has participated in the design and construction of over $2 billion <br />Minnesota No. MN 23685 <br />of public works projects. <br />Nevada No. NV 10660 <br />Arizona No. AZ 27771 <br />Carter Burgess, Inc., Foothill Transportation Corridor - Oso Segment <br />- Principal -In -Charge. Responsible for conceptual studies, environmental <br />document, and design/build documents for this 26 mile toll road on new <br />Professional Affiliations <br />alignment. The project includes 13 arterial and five freeway -to -freeway <br />American Society of Civil <br />interchanges. The estimated cost for the ultimate configuration is $1 <br />Engineers <br />billion. The Foothill/Eastern Transportation Corridors project was awarded <br />TRB Steel Bridge <br />1999 Project of the Year by the Orange County CELSOC. <br />Committee <br />American Public Works <br />Association <br />Los Angeles County Metropolitan Transportation Authority, Metro <br />Pasadena Blue Line - Project Manager and Structures Principal for <br />design and cost containment measures on the 3.56 mile Pasadena Blue <br />32 Years Experience <br />Line segment from the Los Angeles River to the Arroyo Seco Bridge. The <br />$40 million project includes the design of an 11-span slab bridge, 850' <br />long cut -and -cover grade separation, several hundred feet of 6'-30' <br />retaining walls, underground drainage reservoir and pump station. <br />Managed four subconsultants, made presentations to large groups <br />concerning design issues, coordinated with EMC, LADOT and LACMTA, <br />oversaw detailed scheduling for tight schedule, budget control and in- <br />depth QA/QC. <br />OCTA, State Route 91 Widening/HOV PS&E - Structures principal and <br />subsequently during construction Principal -in -Charge. Project includes <br />the design and construction support of the widening of SR91 to <br />accommodate HOV lanes for the Orange County Transportation Agency. <br />Project scope included: CHP enforcement areas, sound and retaining <br />walls, the widening of seven bridges and ramp modifications to four <br />interchanges. <br />^^ VVILLDAN <br />^i.mxx. Page 7 <br />