My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Willdan, Inc. 1
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
W-X (INACTIVE)
>
Willdan, Inc. 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 2:57:18 PM
Creation date
5/9/2003 4:16:27 PM
Metadata
Fields
Template:
Contracts
Company Name
Willdan, Inc.
Contract #
A-2001-113C
Agency
Public Works
Council Approval Date
6/4/2001
Expiration Date
12/31/2003
Insurance Exp Date
11/9/2004
Destruction Year
2011
Notes
Amended by A-2003-067
Document Relationships
Willdan, Inc. 1a
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\W-X (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT A <br />Consultant Rate Comparison Form <br />BI-ANNUAL CONTRACT FOR ON -CALL TRAFFIC ENGINEERING SERVICES <br />Consultant shall complete this form and include it with the comprehensive <br />fee schedule in the sealed fee envelope. <br />The purpose of this form is to provide the City with a basis of comparison of the <br />Consultant's fees. This form will be used for fee comparison purposes only. <br />This form includes cost worksheets for five types of traffic engineering services <br />covered by this contract: New Traffic Signal, Traffic Signal Modification, <br />Channelization Plan, Construction Zone Traffic Control Plan, and Preparation of <br />Grant Application. Relevant assumptions are noted on each worksheet. <br />The total summation of the cost worksheets will be used to compare the <br />Consultant's fees. Please be sure the values are properly transferred from <br />the worksheets. <br />SUMMATION OF COST WORKSHEETS <br />Worksheet Consultant Service <br />1 New Traffic Signal <br />2 Traffic Signal Modification <br />3 Channelization Plan <br />4 Construction Zone Traffic Control Plan <br />5 Preparation of Grant Applications sidewalk <br />Crosswalk <br />TOTAL <br />Cost <br />$ 5.175 <br />$ 5,385 <br />$ 3,990 <br />$ 7,155 <br />$ 5,660 <br />7,075 <br />Q 34,440 <br />Consultant: <br />
The URL can be used to link to this page
Your browser does not support the video tag.