Laserfiche WebLink
Attachment A • • Worksheet No. 4 <br />Consultant Rate Comparison Form <br />BI-ANNUAL CONTRACT FOR ON -CALL TRAFFIC ENGINEERING SERVICES <br />CONSTRUCTION ZONE TRAFFIC CONTROL PLAN <br />Assume: Preparation of four plan sheets, with two segments per sheet, <br />appropriate fieldwork, specifications and cost estimate. <br />Consultant Service <br />Unit <br />Quantity <br />Unit Cost <br />Total <br />Design and Draft Plans <br />Principal Engineer <br />Hours <br />2— <br />$ I <br />$ ,7n <br />Registered Engineer <br />Hours <br />18 <br />$ 105 <br />$ 1, 890 <br />Asst. Level Design Engineer <br />Hours <br />20 <br />$ 90 <br />$1, 800 <br />Draftsperson <br />Hours <br />40 <br />$ .75 <br />$3,000 <br />Hours <br />$ <br />$ <br />Hours <br />$ <br />$ <br />Specifications & Estimate <br />Principal Engineer <br />Hours <br />0 <br />$ 0 <br />$ 0 <br />Registered Engineer <br />Hours <br />1 <br />$105 <br />$ 105 <br />Typist <br />Hours <br />_2 <br />$ A5 <br />$ on <br />Hours <br />$ <br />$ <br />Hours <br />$ <br />$ <br />Total <br />$ 7,155 <br />Consultant: Willaan <br />