My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-19-04
Clerk
>
Minutes
>
CITY COUNCIL COMMITTEES
>
MAIN STREET (2003-2007)
>
2004
>
05-19-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 1:13:36 PM
Creation date
4/5/2006 9:07:58 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Minutes
Date
5/19/2004
Destruction Year
2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ <br /> <br />~ <br /> <br />6. <br /> <br />.... <br /> <br />3. <br /> <br />D.C. MENTAL HEALTH FACILITY <br /> <br />Approximately 100 people a day are using the facility. Statistics for this year <br />show that the activity is not significant, however, at times, it is problematic. Most <br />cases are quality of life problems with no felonies. There have been 33 <br />disturbance calls in the area. Captain Saadeh is working with the Executive <br />Director of the facility to keep the issues down. Captain Saadeh will also look <br />into the statistics for the Delhi neighborhood and bring them back to the <br />committee in two months. <br /> <br />4. S. Main Street Improvements - Phase II Update, George Alvarez <br /> <br />George Alvarez discussed the staging of Phase II improvements from Edinger to <br />Columbine. Stage 1 of Phase II will take place from 9/04 to 11/04 and Stage 2 <br />from 11/04 to 3/05. The total project investment is 3 million. <br /> <br />5. <br /> <br />City Banner Policy, Teri Cable <br /> <br />CHOC banners have been extended for two 90-day periods, which extends the <br />period through June 30, 2004. The committee discussed the issue of multiple <br />groups asking to put banners up in South Main. The committee asked Teri to <br />work with CHOC to bring down one-half of the banners they currently have up to <br />make room for United Way banners. <br /> <br />PROJECT UPDATES <br /> <br />a) SWC First and Main Streets - <br /> <br />Mike Harrah would like to open the restaurant in 6 weeks. Sergio Klotz <br />distributed a status memo on plan check and permit issuance for the project. <br /> <br />b) Citv Place West- <br /> <br />The Environmentalist Consultant is determining the appropriate level of <br />environmental analysis required. <br /> <br />c) YMCA- <br /> <br />Danell Mercado and Matt Lamb are working on a due diligence process with <br />ABCO Realty. John Reekstin is working with Rosie Avila on a potential Youth <br />Facility for the building. Both proposals will be brought to the committee as <br />well as a possible proposal for low-income housing once formally submitted. <br /> <br />May 19, 2004 <br /> <br />City Council Committee on Main <br />Street Development. Minutes <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.