My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75C - HENINGER PARK ARC
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2006
>
04/17/2006
>
75C - HENINGER PARK ARC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:47:34 PM
Creation date
4/12/2006 1:30:48 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75C
Date
4/17/2006
Destruction Year
2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />II. REVIEW PROCESS <br /> <br />The Heninger Park Neighborhood Review Process applies to all properties within Heninger <br />Park. These guidelines apply to new development and rehabilitation projects. To ensure <br />compliance with appropriate design guidelines and City codes, the City has implemented a <br />project review and approval process specifically for Heninger Park. This process is outlined in <br />the following pages and illustrated in Section II (C). <br /> <br />A. City PlanninQ Review <br />Preliminary Meeting <br /> <br />Prior to modifying the exterior of a residence, building an addition, or new residence, the <br />project shall be submitted to the City Planning Division. Before developing plans, <br />applicants are encouraged to discuss the proposal with the City Planning Staff. The <br />preliminary meeting is intended to inform the applicant of the Heninger Park zoning <br />regulations and architectural design guidelines. To obtain project approval in a timely <br />manner, it will be necessary to follow the simple steps to ensure the proposed project <br />meets applicable City codes and is compatible with the architectural character of the <br />Heninger Park Neighborhood <br /> <br />Staff Review <br /> <br />The process will require filing a Neighborhood Review application and submitting plans to <br />the Planning Division. City Planning review is intended to identify the major issues <br />associated with a project. Staff shall consider the following general criteria when a <br />project is submitted for review: <br /> <br />Compliance with the Heninger Park Architectural Design Guidelines (hereinafter HPADG) <br />and Heninger Park zoning provisions (SD-40) including: <br /> <br />. Compatibility in size, height, scale, and context with the surrounding structures. <br />. Relationship between buildings, landscape features, and open space. <br />. Compatibility of proposed design, color, and material with existing structure. <br />. Compatibility of design and materials with surrounding area. <br />. Compatibility of new infill development with surrounding area <br /> <br />B. Historic Resources Commission/PlanninQ Commission <br /> <br />Following the initial City Staff review, the Neighborhood Review application and a set of <br />copies of the proposed project plans will be forwarded to the Heninger Park <br />Neighborhood Association [see Section II (C)]. The Heninger Park Neighborhood <br />Association may review the proposed project for compliance with the provisions of the <br />design guidelines and respond in writing to the City within 14 calendar days of receipt of <br />the submittal plans and application. If no response is received by the City within this time <br />period, it will be assumed that the neighborhood association has no comments regarding <br />the project. <br /> <br />6 <br /> <br />75C-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.