Laserfiche WebLink
EIP <br />Proposal to Prepare an EIR and Provide Planning Consulting Services for <br />The First and Fourth Street Corridors Mixed -Use Overlay Zone <br />January 6, 2006 <br />Section 1. PROJECT UNDERSTANDING <br />It is our understanding that the City's objectives forth is project are to create general plan and <br />zoning tools that will allow a mix of land uses to complement and support increased <br />development intensity in this area. The City desires to facilitate new development consistent <br />with this objective by completing the necessary planning and environmental analysis up front <br />including a general plan amendment, zoning code amendment, and the required <br />environmental review and analysis. <br />This project was precipitated by two pending proposals for mixed use projects that include <br />high-density residential and the need for the City to establish appropriate regulatory tools to <br />review and evaluate these proposals within the context of a cohesive and integrated <br />development strategy for the Overlay Zone area. Generally, we understand that the project <br />will have the following components: <br />• Program level of analysis for the 200+ acre planning area as well as project specific <br />analysis for the Arnel property, currently optioned to Shea Homes, and the Capital <br />Pacific/Makar property which is the old Racquetball World site. We understand that <br />Capital Pacific also may look to develop other properties within the Overlay Zone <br />though no other specific locations have yet been identified. <br />• A 9-12 month project schedule. <br />• Analyze the impacts of an overall FAR of 2.0 within the project area at a maximum <br />residential density of 90 units/acre, as currently permitted in the District Center land <br />use designation. <br />• Analyze the short-term impacts (for project specific components), then long term <br />impacts (to 2030) for programmatic components. <br />• A general plan amendment and zone change. <br />