Laserfiche WebLink
Proposal to Prepare an EIR and Provide Planning Consulting Services for the <br />First and Fourth Street Corridors Mixed -Use Overlay Zone <br />Section 3. EIR SCHEDULE <br />EIP proposes the following schedule to complete a Final EIR by November 2006. <br />The schedule below includes the following assumptions: <br />■ Receipt of a complete and firm project description at kickoff. <br />■ Stable project description throughout the EIR process. <br />■ No substantial environmental issues are raised during the IS/NOP comment period. <br />■ No substantial changes to the traffic report (including trip generation or additional intersections <br />after the completion of the draft report) or other technical reports (including substantial revisions <br />to site plan) are required. <br />25 <br />