My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EIP ASSOCIATES 6
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
E-F (INACTIVE)
>
EIP ASSOCIATES 6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2015 4:29:41 PM
Creation date
4/12/2006 1:49:42 PM
Metadata
Fields
Template:
Contracts
Company Name
EIP Associates dba Post, Buckley, Schuh & Jernigan, Inc. (PBS&J)
Contract #
A-2006-021
Agency
Planning & Building
Council Approval Date
2/6/2006
Insurance Exp Date
9/30/2007
Destruction Year
2012
Notes
Amended by A-2007-057
Document Relationships
EIP ASSOCIATES dba (PBS&J) POST, BUCKLEY, SCHUH & JERNIGAN, INC. 6A
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\E-F (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal to Prepare an EIR and Provide Planning Consulting Services for the <br />First and Fourth Street Corridors Mixed -Use Overlay Zone <br />Section 5. EIP PROJECT MANAGEMENT TEAM <br />This proposal is submitted by: <br />EIP Associates <br />12301 Wilshire Boulevard, Suite 430 <br />Los Angeles, CA 90025 <br />Phone: (310) 268-8132 <br />Fax: (310) 268-8175 <br />E-mail: eipla@eipassociates.com <br />Web Site: www.eipassociates.com <br />EIP specializes in preparing environmental documents and associated planning, natural <br />resources, and technical studies. In our over 30 -year history, we have prepared more than <br />5,000 practical, solution -oriented environmental documents, many of which have received <br />awards at the state and national levels. Our local understanding will reflect in the quality and <br />credibility of work on the proposed project. A complete description of our local and relevant <br />experience is also included. <br />EIP has assembled a uniquely qualified project team that is collectively able to provide the full <br />range of technical and professional skills necessary for this project. Each of the members of <br />the project team is highly regarded in their respective fields of expertise and has <br />demonstrated experience that is directly relevant to the proposed project. The EIP Project <br />Management Team and technical staff have the ability to provide necessary technical <br />information, unbiased recommendations, and solutions to potential conflicts that may arise as <br />the project moves forward. The project team members and brief summaries of their areas of <br />expertise are described below. <br />EIP Associates Project Management Team <br />Preparation of an EIR for the proposed project requires the careful allocation of staff with <br />relevant knowledge regarding mixed-use development and experience with key issues in the <br />project area. EIP has assembled a core Project Management Team (PMT) to oversee all <br />project tasks, direct EIP and subconsultant staff, and coordinate directly with City staff to <br />ensure an efficient, effective process throughout the duration of the project. The PMT will <br />oversee and coordinate all activities, including a final review of all documents to do the <br />following: <br />■ Ensure compliance with CEQA guidelines, technical accuracy, and objectivity; <br />■ Review all technical data to ensure that it is accurately and precisely incorporated into <br />the environmental analyses; <br />■ Provide consistency checks to ensure that significance thresholds are applied accurately <br />and consistently within each topical section; and <br />■ Ensure that impacts and conclusions in all sections are consistently stated. <br />
The URL can be used to link to this page
Your browser does not support the video tag.