My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TRAFFIC CONTROL ENG, INC. 1 - 2002
Clerk
>
Contracts / Agreements
>
T
>
TRAFFIC CONTROL ENG, INC. 1 - 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:00:57 PM
Creation date
4/12/2006 4:50:05 PM
Metadata
Fields
Template:
Contracts
Company Name
Traffic Control Eng. Inc.
Contract #
N-2002-137
Agency
Public Works
Expiration Date
6/30/2003
Insurance Exp Date
9/18/2003
Destruction Year
2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Ju,l '!:os 02 01: 18p <br /> <br />p.l <br /> <br />FRCM TeE <br /> <br />PHG~ NO. 7144476081 <br /> <br />Jul, 29 2002 06:41AM P1 <br /> <br />~I TRAFFIC CONTROL ENGINEERING, INC. <br /> <br />July 29, 2002 <br /> <br />Post-It"'" brand fax transmittal memo 7671 l f!. or pages ~ <br />To S1t>l tAJ From \1 . <br />,; ',7-\"'7[tJ6 l~ - <br />Co, Co, <br />Dept. Phone iI ->b'- <br /> t'" bj c.-. <br />Fax * (;s ( <> Fax If <br /> <br />Mr. Vinh Nguyen <br />City of Santa Ana <br />20 Civic Center Plaza, M-43 <br />Santa Ana, Ca 92702 <br />Fax: 647-5616 <br /> <br />Re: Traffic Control Design Prop~eal <br />for City of Santa Ana <br /> <br />Dear Vinh: <br /> <br />Thank you for the opportunity to propose our services for traffic <br />control engineering work, Traffic Control Engineering (TeE) has <br />a substantial track record in preparing Traffic Control Plans. <br />Our familiarity with traffic control design and our past projeccs <br />wich boch concractors and local governments will be the greatest <br />asset in assuring a effective training programs. <br /> <br />TCE will provide letter proposals for services requested by the <br />City, The letter proposal shall include the estimated cost and <br />time to complete the services. City will provide written <br />acceptance of the letter proposal prior to our commencement of <br />work. <br /> <br />Attached also please find our f~rm's fee schedule. <br /> <br />I would like to thank you for considering us for this work. <br />If chere are any quescions. please feel free to call me at your <br />convenience. <br /> <br />Sincerely, <br /> <br />TRAFFIC CONTROL ENGINEERING, INC. <br /> <br />~,~ <br /> <br />David Kuan, P.E., President <br />DK,dr <br /> <br />231 E. Imperial Hwy., Suite 241 <br />Fullerton, CA 92835 <br /> <br />TEL (714) 447-6077 <br />FAX (714) 447-6081 <br /> <br />~XH'RIT <br /> <br />a <br />
The URL can be used to link to this page
Your browser does not support the video tag.