Laserfiche WebLink
<br />modeled with ~anhole numbers, sizes, flow direction ~ws, and tributary flow areas shaH <br />be included. OCSD trunk sewers shall also be shown on this map. <br /> <br />Hard copies of the digital land use maps shall also be included. The tributary subareas <br />used in calculating sewage flows shall be shown on this map along with a legend for the <br />various land use classifications. A listing of the total area in each subarea by land use <br />classification shall be provided, along with the calculated flow from each subarea. <br /> <br />The report shall contain an Infiltration and Inflow (III) Study. The III Study shall provide an <br />overview ofthe extent of infiltration and inflow into the sewer system, and shall identify <br />areas of potential problems and provide an overall estimate of impacts to the system. <br />Recommendations for future more detailed studies shall be included. Documentation of <br />the structural condition of those sewers televised in this project shall also be included, <br />along with recommendations on additional condition assessment activities. <br /> <br />Submit five copies ofthe draft report for review and comment by the City. <br /> <br />8.2 Prepare a final Master Plan Report, incorporating responses to the City's comments on the <br />draft report. Submit 15 copies of the final report. <br /> <br />8.3 Submit databases and digital files created for this project to the City. Databases related to <br />the manholes and sewers shall include MS link numbers to facility future City use. Model <br />input and key output results shall be delivered, but commercial or proprietary modeling and <br />data management software programs shall not be provided unless separately purchased by <br />the City. Documentation shall be provide on the information in the databases and the <br />procedures used to develop the information, including the elevation adjustments. <br /> <br />9. Manage Proiect and Attend Meetings <br /> <br />9.1 During the course of the study, ten monthly progress meetings shall be held with City staff <br />to present key findings and discuss schedules and project issues such as design criteria, <br />map formats, and report content. <br /> <br />9.2 Perform project management tasks including tracking of project costs and schedules, <br />management of staff resources, preparation of monthly progress reports and invoices, <br />quality control, and communication with City staff. <br /> <br />10. Perform CMOM Assessment <br /> <br />10.1 Perform a CMOM assessment as an amendment to this scope of work if authorized by the <br />City. The assessment would review and summarize the City's existing collection system <br />maintenance and management programs within the framework of the upcoming <br />SSO/CMOM regulations, and highlight areas that require improvement. A detailed scope <br />of work and budget for this task shall be prepared upon authorization by the City. <br /> <br />CS 387 FORM; C:\OOCUME-l\cle~haw\LOCALS-- tlTemp\Agrmnent pl\(:kage for city Attomey_.doc <br />