<br />Contract Change Order No. 2 - <br />Bowers Museum Overflow Parking <br />Lot (Project No. 06-3000) <br />May 15, 2006 <br />Page 2 <br /> <br />DISCUSSION <br /> <br />Change Order Number: 2 <br /> <br />Project Description: Bowers Museum Overflow Parking Lot <br /> <br />Contractor: Hardy & Harper, Inc. <br />1312 East Warner Avenue <br />Santa Ana, California 92705 <br /> <br />Original Contract Cost: $356,715.10 <br /> <br />Amount of this <br />Change Order: <br /> <br />$103,000 <br /> <br />28.9% <br /> <br />Previously approved <br />Change Order: <br /> <br />11,068 <br /> <br />3.1 <br /> <br />Total Change Orders: <br /> <br />$114,068 <br /> <br />32.0% <br /> <br />The contract documents require the excavation and grading of the parking <br />lot before paving. During construction the actual quantity of excavated <br />material was found to exceed the estimated quantity for the contract. <br />The cost overrun is due to an oversight in estimating the quantity of <br />excavated material. The contractor will be paid according to the actual <br />quantities of work and the agreed unit price. <br /> <br />Estimated cost = $103,000 <br /> <br />The Agency/Council's approval is required to cover the extra costs <br />exceeding the project contingency. <br /> <br />80A-2 <br /> <br />