My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - FY 06/07 CITY BUDGET& MISCELLANEOUS FEES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2006
>
06/05/2006
>
75A - FY 06/07 CITY BUDGET& MISCELLANEOUS FEES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:46:18 PM
Creation date
5/30/2006 4:33:02 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75A
Date
6/5/2006
Destruction Year
2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />RESOLUTION 2006 <br />REVENUE FY 06-07 <br />ACCOUNT DEPARTMENT/MISCELLANEOUS FEE OR SERVICE UNIT FEES <br />SECTION X PLANNING & BUILDING AGENCY <br />5913 9) Signs and high-potential gas tube lighting, each Each 28.40 <br /> Note: This shall include all necessary control equipment <br />5913 ]0) Swimming pool, fountain, spas, each Each 62.35 <br />5913 11) Above ground spas Each 20.25 <br />5913 ]2) Temporary power- construction: <br /> For services supplying a temporary power pole, <br /> pedestal or piggyback Each 48.95 <br /> For a system of distribution and utilization of poles <br /> for temporary construction power, each pole Each Pole 9.35 <br />5913 13) Temporary construction lighting: <br /> 500 lamps or less 425 <br /> Over 500 lamps 7.35 <br />5913 14) Temporary services: <br /> At the time of application for temporary power, the owner <br /> shall post a $1,000.00 cash or cashier's check conforming to the <br /> Santa Ana Municipal Code Section 8-1768 for each service <br /> meter. This deposit shall be released upon request after the <br /> Certificate of Completion or Certificate of Occupancy is issued. <br /> Temporary electric service prior to final approval or <br /> occupancy, each meter Each Meter 177.25 <br /> Temporary work with service, each meter Each Meter 2500 <br />5913 15) Lighting standards: <br /> With one (1 ) fixture each Each 9.35 <br /> Each additional fixture on the same standard Each 2.75 <br />5913 16) Time clock or photo electric cell, each Each 7.35 <br /> <br />52 <br /> <br />75A-68 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.