My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2006-06-05
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2006
>
06/05/2006
>
FULL PACKET_2006-06-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:46:01 PM
Creation date
5/31/2006 9:08:33 AM
Metadata
Fields
Template:
City Clerk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 2006 <br />REVENUE <br />ACCOUNT DEPARTMENT/MISCELLANEOUS FEE OR SERVICE <br />SECTION X PLANNING & BUILDING AGENCY <br />5913 17) Radiant ceiling heat per room <br />5913 18) Power apparatus: generators, motors, transformers, <br />rectifiers, synchronous converters, capacitors, <br />industrial heating, cooking or baking equipment, and <br />other apparatus as follows: <br />(Ratings -horsepower (HP), kilowatts (KW), and <br />Kilovolt amps (KVA)) <br />Up to and including 1 HP, KW, KVA each <br />Over 1 and not over 10 HP, KW, KVA each <br />Over 10 and not over 50 HP, KW, KVA each <br />Over 50 and not over 100 HP, KW, KVA each <br />Over 100 and not over 500 HP, KW, KVA each <br />Over 500 HP, KW, KVA each <br />5913 l9) Demolition, per project <br />5913 20) Inspections outside of normal business hours (four hour <br />minimum charge for Holidays, Saturday or Sunday <br />inspections) <br />5913 21) Re-inspection fee assessed under applicable provisions <br />of the Building Code <br />5913 22) Inspections for which no fee is specifically <br />indicated (minimum charge -one (1) hour) <br />5403 23) Additional plan review required by changes, additions, or <br />revisions to approved plans (minimum charge -one (1) hour) <br />ELECTRICAL PLAN CHECK FEES <br />Whenever electrical plans are required by the Building <br />Official, plan check fees shall be 65% of the electrical <br />permit fee and shall be paid at the time of submitting plans. <br />53 <br />FY 06-07 <br />UNIT FEES <br />Per Room 9.35 <br />Each 3.95 <br />Each 9.90 <br />Each 20.00 <br />Each 42.65 <br />Each 56.75 <br />Each 71.00 <br />Per Project 27.60 <br />Per Hour 71.00 <br />Per Hour 71.00 <br />Per Hour 71.00 <br />Per Hour 71.00 <br />75A-69 <br />
The URL can be used to link to this page
Your browser does not support the video tag.