My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH, INC. 2A - 2006
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH, INC. 2A - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 1:58:39 PM
Creation date
6/6/2006 10:39:22 AM
Metadata
Fields
Template:
Contracts
Company Name
TETRA TECH, INC.
Contract #
A-2006-107
Agency
Public Works
Council Approval Date
5/1/2006
Insurance Exp Date
10/1/2009
Destruction Year
2011
Notes
Amends A-2005-142
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSURED <br />Tetra Tech, Inc. <br />16241 Laguna Canyon Rd. <br />Irvine CA 92618 usA <br />100983 (2/09) <br />Construction Project General Aggregate Limit. <br />B. For all sums which the insured becomes legally obligated to pay as damages caused by <br />"occurrences" under COVERAGE A (SECTION I ), offenses under COVERAGE B (SECTION 1) and for all <br />medical expenses caused by accidents under COVERAGE C (SECTION I ), which cannot be attributed <br />only to ongoing operations at a single construction project: <br />1 Any payments made under COVERAGE A or B for damages or under COVERAGE C for medical <br />expenses shall reduce the amount available under the General Aggregate Limit or the <br />Products-Completed operations Aggregate Limit, whichever is applicable; and <br />2. Such payments shall not reduce any Construction Project General Aggregate Limit. <br />C. when coverage for liability arising out of the "products-completed operations hazard" is <br />provided, any payments for damages because of "bodily injury" or "property damage" included in <br />the "products-completed operations hazard" will reduce the Products-Completed Operations <br />Aggregate Limit, and not reduce the General Aggregate Limit nor the Construction Project <br />General Aggregate Limit. <br />~. If the applicable construction project has been abandoned, delayed, or abandoned and then <br />restarted, or if the authorized contracting parties deviate from plans, blueprints, designs, <br />specifications or timetables, the project will still be deemed to be the same construction <br />project. <br />E. The provisions of Limits of Insurance (SECTION III ) not otherwise modified by this <br />endorsement shall continue to apply as stipulated. <br />100983 (2/09) Page 11 <br />Certificate No : 570036487169 <br />
The URL can be used to link to this page
Your browser does not support the video tag.