Laserfiche WebLink
<br />The three proposed buildings are referred to as Building A, <br />Building B and Building C. <br /> <br />Building A consists of 8,171 square feet of area. The building <br />would contain a 8, 171 square foot sit down restaurant with an <br />outdoor dinning area. In the future, this restaurant may <br />include a concert venue and/or nightclub within existing square <br />footages which would operate exclusively during the evening <br />hours when other uses wi thin the office park are closed. A <br />nightclub/concert venue would require separate City approvals. <br /> <br />Building B would consist of 5,302 square feet <br />building would contain 4,315 square feet of food <br />a 1,486 square foot coffee shop. In addition, 987 <br />retail uses are proposed. <br /> <br />of area. The <br />uses including <br />square feet of <br /> <br />Building C would consist of <br />building would contain 2,500 <br />retail tenant spaces totaling <br /> <br />6,681 square feet of area. The <br />square feet of food uses and two <br />4,211 square feet. <br /> <br />As shown on Exhibit 3 the three buildings reflect a modern <br />architecture design. The exterior of the buildings would have a <br />smooth troweled plaster finish, natural concrete finish and a <br />light sand plaster finish. The exterior building finish would be <br />accented with stone veneer, cultured stone veneer, and aluminum <br />storefront systems. A combination of tans and metal paint <br />finishes would be incorporated into the design of the buildings. <br /> <br />Parking <br /> <br />A total of 174 parking spaces are required for the project while <br />175 parking spaces are provided on site. In the future, the <br />8,060 square foot restaurant may include a concert venue and/or <br />nightclub which would operate exclusively during the evening <br />hours when other uses within the office park are closed. Should <br />this occur at some future date, parking could be shared between <br />uses within the office park since they would operate at <br />different times. <br /> <br />Phasing/Construction Operations <br /> <br />The proposed <br />Construction <br />clearing of <br />buildings. <br /> <br />project <br />operations <br />the proj ect <br /> <br />would be developed in one phase. <br />for the project would involve the <br />si te and construction of the three new <br /> <br />3 <br /> <br />75A~28 <br />