My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - CRAZY HORSE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2006
>
06/19/2006
>
75A - CRAZY HORSE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:45:53 PM
Creation date
6/14/2006 2:17:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75A
Date
6/19/2006
Destruction Year
2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />compliance with the City's Fire Code and emergency access <br />requirements. Based on comments from the Fire Department, the <br />project has incorporated fire/life safety systems such as <br />automatic fire sprinkler systems, and fire alarms into the <br />design of the project. Additionally, emergency access has been <br />provided in accordance with Fire Department standards. The Fire <br />Department has determined that the proposed project is in <br />compliance with the City's Fire Code. Implementation of the <br />proposed project would not result in significant long-term <br />impacts on the ability of the Fire Department to provide <br />adequate fire protection services. Additionally, there would be <br />no construction-related impacts on fire protection/emergency <br />services since most construction activities would occur on site. <br />The project area would be temporarily fenced during construction <br />operations to restrict public access to the project site. <br />Construction related impacts on fire protection services would <br />not be significant. <br /> <br />Police Protection: <br /> <br />Less Than Significant impact <br /> <br />The Santa Ana Police Department would provide police protection <br />services for the proposed project. The Police Department is <br />headquartered at 60 Civic Center Plaza. <br /> <br />The City of Santa Ana is subdivided into four policing <br />districts, with each district serving a section of the City. <br />The proposed proj ect is located wi thin the Southeast District. <br />The District is considered to be an average crime area, compared <br />to other areas in the City. <br /> <br />Implementation of the proposed project would increase the demand <br />for police protection services over current level of demand. The <br />Santa Ana Police Department has indicated that under existing <br />levels of manpower and equipment, they would have the ability to <br />provide adequate police protection services. <br /> <br />Through the City's development review process, the Santa Ana <br />Police Department has reviewed the proposed proj ect for <br />compliance with the City's Building Security Ordinance. The <br />project is required to submit a plan indicating all structures <br />and parking lots comply with the provisions of Building Security <br />Ordinance. With compliance with the Building Security Ordinance <br />implementation of the proposed project would not result in <br />significant impacts on the ability of the Santa Ana Police <br />Department to provide adequate police protection services. <br /> <br />School Facilities: Potentially Significant Unless Mitigation <br />Incorporated <br /> <br />26 <br /> <br />7 ~'1~6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.