My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2006-06-19
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2006
>
06/19/2006
>
FULL PACKET_2006-06-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:45:36 PM
Creation date
6/14/2006 3:12:53 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
on Table 1 all study intersections are currently operating at an <br />acceptable Level of Service in both peak hours. <br />TABLE 1 <br />SUMMARY OF PEAK HOUR INTERSECTION OPERATION <br />EXISTING CONDITIONS <br /> AM Peak Hour PM Peak Hour <br />No. Signalized Intersection (City)' ICU LOS ICU LOS <br />1 Grand Ave @ Warner Ave 0.457 A 0.730 C <br />2 Grand Ave @ Brookhollow Dr 0.347 A 0.424 A <br />3 Grand Ave @ Dyer Rd 0.624 B 0.828 D <br />4 Main St @ Dyer Rd 0.515 A 0.726 C <br />5 Redhill Ave @ DyerBarranca 0.849 D 0.723 C <br /> AM Peak Hour PM Peak Hour <br />No. Signalized Intersection (Caltrans) 1 Delay LOS Delay LOS <br />6 Grand Ave @ SR-55 SB Ramp 16.8 B 15.8 B <br />7 SR-55 SB Ramp @ Dyer Rd 28.5 C 26.6 C <br />8 SR-55 NB Ramp @ Dyer Rd 17..9 B 14.3 B <br />Intersections under the control of Caltrans are evaluated using the Highway Capacity Manual <br />methodology. All others are evaluated using the Intersection Capacity Utilization (ICU) method. <br />Project Build-Out Conditions <br />The Project Build-Out Traffic Condition consists of existing <br />peak hour traffic with an annual growth rate applied for each <br />year between existing condition and the anticipated Build-out <br />year for the project. The Crazy Horse Square project would be <br />completed in 2007, so a 1% growth was applied to existing <br />traffic to account for ambient growth in the area. Peak hour <br />operating conditions for Project Build-out Year without the <br />project are summarized on Table 2. As shown on Table 2, all <br />study area intersections are forecasted to continue to operate <br />at an acceptable Level of Service in the Project Build-out year. <br />31 <br />7 #~ 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.