My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2006-06-19
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2006
>
06/19/2006
>
FULL PACKET_2006-06-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:45:36 PM
Creation date
6/14/2006 3:12:53 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
regards to water service would be associated with the proposed <br />project. <br />A. Exceed wastewater treatment requirements of the applicable <br />Regional Water Quality Control Board? <br />B. Require or result in the construction of new water or <br />wastewater treatment facilities or expansion of existing <br />facilities, the construction of which could cause <br />significant environmental effects? <br />E. Result in the determination by the wastewater treatment <br />provider, which serves or may serve the project that it has <br />adequate capacity to serve the project's projected demand <br />in addition to the providers existing commitments. <br />Less Than Significant Impact <br />The City of Santa Ana and the Orange County Sanitation District <br />(OCSD) would provide wastewater service to the proposed project. <br />The project area is currently improved with wastewater sewer <br />facilities. A combination of City of Santa Ana local sewer lines <br />and OCSD trunk sewer lines would service the project site. <br />Wastewater generated from the site would be treated at Orange <br />County Sanitation District Reclamation Plant N0. 1. in the City <br />of Fountain Valley. The treatment plan treats approximately 90 <br />million gallons per day. <br />As mentioned previously, the City of Santa Ana utilizes a water <br />demand rate of 100 gallons per day for each 200 square feet of <br />retail and restaurant area to calculate both water and <br />wastewater demand. The wastewater demands of the project are <br />accounted for in the City's Urban Water Management Plan. <br />The wastewater flows generated from the proposed project would <br />provide an incidental increase in the amount of wastewater flows <br />to the Reclamation Plant No. 1 and would not have less than a <br />significant impact on wastewater treatment facilities. To <br />address cumulative wastewater service impacts within the project <br />area the project area the proposed project would be subject to <br />sewer connection fees with the City of Santa Ana and OCSD. <br />C. Require or result in the construction of new storm water <br />drainage facilities or expansion of existing facilities, <br />the construction of which could cause significant <br />environmental effects? <br />Less Than Significant Impact <br />Implementation of the proposed project would not significant <br />increase the amount of surface water runoff currently generated <br />from the project site. Onsite drainage improvements would needed <br />41 <br />7~~1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.