Laserfiche WebLink
CRAZY HORSE SQUARE <br />1580 E. WARNER AVENUE / ER 2004-109 <br />MITIGATION MONITORING PROGRAM <br />MITIGATION MEASURE TIMING RESPONSIBLE <br />AGENCY VERIFICATION <br />To ensure compliance Prior to Building/Planning <br />with SCAQMD Fugitive Demolition, Agency <br />Dust Rule 403, building, Grading, Public Works <br />grading, and demolition Building <br />plans for the proposed permits <br />project shall reflect <br />the following notes: <br />All material excavated <br />or graded will be <br />sufficiently watered to <br />prevent excessive amount <br />of dust . <br />All clearing and <br />earthwork activities <br />shall cease during <br />period of high winds <br />(winds greater than 25 <br />mph averaged over one <br />hour) or during Stage 1 <br />or Stage 2 smog <br />episodes. <br />Streets surrounding the <br />project site should be <br />cleaned at the end of <br />each day of <br />construction. <br />All material transported <br />offsite shall either be <br />sufficiently watered or <br />securely covered to <br />prevent excessive <br />amounts of dust. <br />The amount of area <br />disturbed by clearing <br />and earthwork activities <br />shall be minimized at <br />7~#~8 <br />