My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOWERS MUSEUM - 2006 2ND AMEND TO OPERATING AGMT
Clerk
>
Contracts / Agreements
>
B
>
BOWERS MUSEUM - 2006 2ND AMEND TO OPERATING AGMT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2013 2:15:39 PM
Creation date
6/27/2006 9:00:13 AM
Metadata
Fields
Template:
Contracts
Company Name
Bowers Museum
Contract #
A-2006-162
Agency
City Attorney's Office
Council Approval Date
4/17/2006
Notes
Amends A-2005-257
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Exhibit A <br />Traffic Signal Related Work <br /> <br />Traffic Signal Related Scope of work: <br /> <br />This work consists of the installation of traffic signal related facilities including traffic <br />signal conduit (550 feet), pull boxes (six), signal pole foundations (three), signal <br />controller foundation (one), concrete pad (forty two square feet) and any other work or <br />material required to provide the intended operations at the location as shown on the plan. <br />The work is identified on the traffic signal plan #TS-060l7 dated May 5, 2006 as work to <br />be done by others. <br /> <br />Payment: <br /> <br />The payment in the amount not to exceed $60,000 for the traffic signal related work <br />described in the scope of work shall include full compensation for furnishing all labor, <br />materials, tools, and other incidental to provide the intended installation configuration of <br />the new traffic signal as shown on the plan. <br /> <br />Specifications: <br /> <br />ITEM UNIT QUANTITY <br />Cabinet Foundation EA 1 <br />NO.6 Pull Box with Fiberlyte Non-Concrete <br />Lid EA 6 <br />Bore & Install 2" PVC ner nlan LF 400 <br />Bore & Install 3" PVC oer olan LF 150 <br />Concrete Pad SF 42 <br />Sianal Pole Foundation and Install EA 3 <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.