My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
VISIPHOR CORP 1 -2006
Clerk
>
Contracts / Agreements
>
V
>
VISIPHOR CORP 1 -2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 11:01:56 AM
Creation date
7/26/2006 9:21:16 AM
Metadata
Fields
Template:
Contracts
Company Name
VISIPHOR CORPORATION
Contract #
A-2006-169
Agency
POLICE
Council Approval Date
7/3/2006
Insurance Exp Date
8/31/2007
Destruction Year
2015
Notes
Amended by A-2009-009, A-2009-157, A-2010-138(A-2010-228)
Document Relationships
VISIPHOR CORPORATION (KCC) KNOWLEGE OF COMPUTING (CANADA) 1B-2009
(Amended By)
Path:
\Contracts / Agreements\V
VISIPHOR CORPORATION 1A-2009
(Amended By)
Path:
\Contracts / Agreements\V
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK 10: INFORCE AB SOLUTION FUNCTIONAL TESTING AND VALIDATION <br />OBJECTIVE <br />Perform functional tests on InForce AB <br />TASK DESCRIPTION <br />Demonstrate the applicable functions and features of InForce AB as defined in the InForce AB <br />specification documents. Santa Ana staff will perform functional testing of the InForce AB subsystem. <br />RESPONSIBILITIES <br />Visiphor Responsibilities <br />• Utilize Visiphor's RFP response and the system acceptance test plan as a guideline for all <br />InForce AB functional testing. <br />• Certify all applicable software and subsystems as ready for functional testing. <br />• Review any discrepancies in functionality identified by Santa Ana. <br />• Software or documentation shall be corrected prior to InForce AB Final Certification as needed to <br />correct the discrepancies as identified. <br />• Test the baseline functionality of the InForce AB subsystem according to an agreed upon set of <br />testing scenarios. <br />• Visiphor will ensure InForce AB and BIE work as specified in as-built documentation <br />Santa Ana Responsibilities <br />• Generate production data files needed for functional testing. <br />• Document each discrepancy between the InForce AB subsystem functionality and the RFP <br />response and the system acceptance test plan material. <br />• Work with Visiphor to identify the type of correction needed to ensure that the subsystem <br />conforms to the testing criteria. <br />• Will ensure all systems and all 3r° party systems are working correctly <br />• Will ensure 3rtl party vendors will assist in testing and modifying configurations as required to <br />ensure the InForce AB system is functioning as designed <br />• Will perform load and functionality tests on all equipment, vendor solutions and applicable <br />software prior to InForce AB functional testing <br />• Visiphor will ensure InForce AB and BIE work as specified in as-built documentation <br />• Santa Ana PD will pertorm functional testing as defined in the specification documents and Santa <br />Ana's configuration requirements. <br />Visiphor Corp. Page 34 of 41 <br />Version 1.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.