Laserfiche WebLink
RESPONSIBILITIES <br />Visiphor Responsibilities <br />• Visiphor will work with Santa Ana PD to specify a Test Validation Plan in which to test TSS an <br />ensure TSS meets InForce AB requirements <br />• Visiphor will execute the Test Validation plan in cooperation with SAPD <br />Santa Ana Responsibilities <br />• Santa Ana PD will ensure the Hardware and 3rtl Party Software required for InForce AB to run as <br />built is available, as outlined in this SOW <br />• Santa Ana PD will provide testing facilities and support <br />• Santa Ana PD will work with Visiphor to specify a Test Validation Plan in which to test TSS an <br />ensure TSS meets InForce AB requirements <br />• SAPD will execute the Test Validation plan in cooperation with Visiphor <br />• Santa Ana PD will work with Visiphor to specify a Test Validation Plan in which to test TSS an <br />ensure TSS meets InForce AB requirements. <br />COMPLETION CRITERIA <br />• Visiphor will report the results of the InForce AB testing <br />• Visiphor will develop a Test Validation Plan <br />• Have a working environment upon which the InForce AB system may be installed and used as <br />specified in this SOW <br />wsipnor corp. Page 15 of 41 <br />Version 1.0 <br />