City of Santa Ana <br />Request for Qualifications - Demolition Services <br />February 15, 2006 <br />• Confirming that all required licenses, permits and certifications have been acquired for implementing the <br />abatement plan <br />• Submittal of the SCAQMD approved abatement plan for CSA approval to proceed with its <br />implementation <br />• Contacting CSA upon field superintendent notification field personnel have stopped work upon the <br />discovery of suspect asbestos, regulated, or hazardous waste <br />• Notifying agencies required for final inspections and sign-offs <br />• Tracking the CTO schedule and budget using project management software <br />• Providing schedule and budget updates to CSA as required <br />• Notifying OCTA to have all work inspected within 24 hours of CTO work completion <br />• Preparation of all required paperwork for final closure package and billing for the project <br />Field Superintendent: <br />• Conducting periodic tailgate Health & Safety meetings, to cover health and safety issues with field <br />workers <br />• Being on site at the time the agency is scheduled to inspect utility termination <br />• Visually surveying existing improvements and utilities near the work site, in order to protect them from <br />damage <br />• Visually surveying the site for potential materials containing regulated/ hazardous wastes <br />• Verifying waste is properly manifested for disposal at proper facility <br />• Conducting a pre-demolition survey upon completion of abatement plan implementation to identify: that <br />the asbestos, lead, regulated and hazardous wastes have been removed as per their abatement plans; <br />verify monitoring records; verify proper manifesting of waste disposal; visually verify no other hazardous <br />materials are left in demolition area; as required, verify site is secured by appropriate fencing; verify that <br />appropriate protection devices are in place, such as pedestrian protection canopy; verify appropriate <br />signing displayed (i.e. no trespassing, keep out demolition in progress, danger, etc.); verify all utilities <br />have been terminated; and erosion control measures are in place, as needed and required <br />Using a checklist to complete the pre-demolition survey <br />Confirming with the Project Manger that the demolition area is ready for demolition <br />Directing crews in structure demolition; improvements demolition; salvaging procedures; and solid waste <br />clearing and disposal <br />Reviewing fieldwork daily for compliance with CTO specifications and recording findings in a quality <br />control log <br />Notifying the Project Manager when field personnel stop work upon the discovery of suspect asbestos, <br />regulated, or hazardous waste <br />Leave the work site in a clean and neat condition, upon completion of the CTO <br />Safety Officer: <br />Preparation of site specific Health & Safety Plan <br />Periodically conducting site safety inspections <br />Asbestos Abatement Consultant: <br />• Asbestos and lead-based paint survey <br />• Abatement plan for asbestos and lead containing materials removal and disposal <br />Abatement plan implementation upon CSA approval of the SCAQMD approved abatement plan <br />J&G Industries Page 11