Laserfiche WebLink
Leighton Consulting, Inc. <br />P IEIpXiO!( G0.0UP COMV<NY <br />2006 PROFESSIONAL FEE SCHEDULE* <br />FOR PREVAILING WAGE PROJECTS <br />PROFESSIONAL SERVICES <br />TECHNICAL STAFF <br />17781 Cowan <br />Irvine, CA 92614 <br />949-250-1421 1 Fax 949-250-1114 <br />Std Rate Santa Ana <br />Laborer**....................................................................................................................................................................90....................70 <br />Soil/Field Technician**..............................................................................................................................................385 <br />....................90 <br />Staff Engineer/Geologist/Scientist/Field Supervisor..................................................................................................319....................95 <br />Senior Staff Engineer/GeologisUScientist.................................................................................................................425..................110 <br />Operations Manager/Equipment Operator................................................................................................................345..................120 <br />ProjectEngineer/Geologist/Scientist........................................................................................................................445 <br />..................130 <br />Senior Project Engineer/Geologist/Scientist.............................................................................................................460..................140 <br />Associate..................................................................................................................................................................480 <br />..................155 <br />Principal....................................................................................................................................................................495 <br />..................165 <br />SeniorPrincipal........................................................................................................................................................235..................200 <br />TECHNICAL SUPPORT STAFF <br />Administrative Assistant/Word Processor...................................................................................................................78 ....................59 <br />CAD Operator/Technical Illustrator/GIS Specialist....................................................................................................100....................85 <br />ENGINEERING EQUIPMENT <br />VehicleUsage. ............................................................. ........ _ ................................................ ................ $ 10 per hour ...................... 9 <br />Tiltmeter, Inclinometer Units... . ...................................................................... ............................................. 290 per day ..................170 <br />NuclearSoil Gauge.......................................................................................................................................80 per day ....................68 <br />GPSStation.................................................................................................................................................360 per day ..................136 <br />• Overtime for field personnel (all technician and staff levels) will be charged at 1.5 times the basic rate. <br />• Expert witness testimony will be charged at 2.0 times the above rates, with a minimum charge of four hours per day. <br />• Invoices are rendered monthly, payable upon receipt. <br />• Proposals are valid for 30 days, unless otherwise stated in the proposal. <br />• Heavy equipment, subcontractor fees and expenses, supplemental insurance, travel, shipping, reproduction, and other reimbursable <br />expenses will be invoiced at cost plus 15%, unless billed directly to, and paid by client. <br />• Thirty percent of the fee for field studies will be invoiced immediately to cover equipment and mobilization costs. <br />• Client agrees to provide all information in Client's possession about the actual or possible presence of buried utilities and hazardous <br />materials on the site, and agrees to reimburse Leighton for all costs related to their unanticipated discovery. <br />• Rates predicated on standard insurance coverage and a limit of liability to our fees for the project. <br />• For "paid when paid" contracted work, Leighton shall receive payment within 10 calendar days from when our client receives payment <br />for our services. <br />• Minimum Hourly Charges for Field Technicians: <br />1. Monday-Friday..........................................................................................................2 Hour Minimum <br />2. Saturday and Sunday...............................................................................................4 Hour Minimum <br />* Effective through December 31, 2007, after which remaining work will be billed at then -current rates, or renegotiated. <br />** Subject to change based upon project advertised date. <br />9060 499 <br />1-06P <br />EXHIBIT 1YV <br />