My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-2006-043
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
A-2006-043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:32:56 PM
Creation date
7/26/2006 10:42:58 AM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY
Contract #
A-2006-043
Agency
PUBLIC WORKS
Council Approval Date
3/6/2006
Expiration Date
12/31/2013
Destruction Year
2018
Notes
AMENDED BY A-2006-043-01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />21 <br /> <br />22 <br /> <br />23 <br /> <br />24 <br /> <br />25 <br /> <br />26 <br /> <br />AGREEMENT C-6-0069 <br /> <br />I <br /> <br />EXHIBIT H - BRISTOL STREET CORRIDOR SCOPE OF WORK <br /> <br />2 <br /> <br />3 <br /> <br />Phase I: Centerline of McFadden to 300' North of Pine Street <br />· Widen Bristol Street to 100' from curb face to curb face. <br />o 3 lanes in each direction with landscaped Median island <br />· Right-of-Way to Vary 150'-315' <br />· Construct s storm drain system (Funding for the main line from Pine to <br />McFadden which will be constructed with the City's current project, Pine to Third) <br />· Modify Traffic Signals and install CCTV per plans <br />· Install Signal Interconnect <br />· Install ADA curb Ramps as necessary <br />· Construct Sound wall <br />· Construct landscaped median islands from McFadden to 300'N/0 Pine St. <br />· Construct Approx. 248,000 SF of parkway and linear park <br />· Construct Cul-de-sacs per CSA Std 1106 <br />· Install sidewalk lighting at back of sidewalk per Exhibit E. <br />· Construct PCC Buspad per CSA Std. 1108 <br />· Other improvements as needed for the widening of Bristol street per the Specific <br />Plan <br /> <br />4 <br /> <br />5 <br /> <br />6 <br /> <br />7 <br /> <br />8 <br /> <br />9 <br /> <br />10 <br /> <br />II <br /> <br />12 <br /> <br />13 <br /> <br />14 <br /> <br />IS <br /> <br />Phase II: 200' South of Third Street to Centerline of Civic Center Drive <br />· Widen Bristol Street to 100' from curb face to curb face. <br />o 3 lanes in each direction with landscaped Median island <br />· Right-of-Way to Vary 150'-360' <br />· Install Signal Interconnect, modify Traffic Signals and install CCTV per plans <br />· Install ADA curb Ramps as necessary <br />· Construct Stonm drain system. <br />· Adjust all utilities to grade and/or relocate as needed. <br />· Construct Soundwall <br />· Place new Signing and Striping. <br />· Construct landscaped median islands from McFadden to 200'S/0 Third St. <br />· Construct Approx. 106,000 SF of parkway and linear park <br />· Construct Cul-de-sacs per CSA Std 1106 <br />. Install sidewalk lighting at back of sidewalk per Exhibit E. <br />· Construct PCC Buspad per CSA Std. 1108 <br />· Construct decorative sidewalk and landscaping at intersection <br />· Other improvements as necessary to complete the widening per the Specific Plan <br /> <br />16 <br /> <br />17 <br /> <br />18 <br /> <br />19 <br /> <br />20 <br /> <br />Page 25 of 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.