My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CABAN, GEORGE & ANCA 2-2006
Clerk
>
Contracts / Agreements
>
C
>
CABAN, GEORGE & ANCA 2-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:06:39 PM
Creation date
7/26/2006 11:07:21 AM
Metadata
Fields
Template:
Contracts
Company Name
GEORGE & ANCA CABAN
Contract #
A-2006-159
Agency
Public Works
Council Approval Date
6/19/2006
Expiration Date
6/19/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />RIDER <br /> <br />CAFE EXPRESS REMODEL PLANS <br /> <br />KITCHEN AREA <br /> <br />Immediate - within 30 days of contract approval (Upon approval of <br />minimum 3-year lease w/options) <br /> <br />*Install a new refrigerator (to right of entryway) <br /> <br />*Replace old kitchen flooring (with OC Health Department and Depot <br />management approved product) <br />--Will require possible brief closure which will be minimized by <br />weekend installation by licensed contractor <br /> <br />DINING AREA <br /> <br />Immediate (Upon approval of minimum 3-yr lease w/options) <br /> <br />*Replace chairs <br /> <br />Within first term of lease (3 years) <br /> <br />Complete remodel: Remodel plans must be approved by City <br />(Executive Director/Designee) prior to issuance of permits or <br />commencement of construction. <br /> <br />*Lower ceiling-have engineer work with city regarding <br />air conditioning and lighting standards <br /> <br />*Add soffit with special lights over food preparation area <br /> <br />*Recessed lighting in dining area, with textured plaster ceiling <br /> <br />*Add hanging lamp treatment at Palladian window area <br /> <br />*Install small, discreet speakers in ceiling <br /> <br />*Painting interior <br /> <br />*Install new flooring in Dining Area (approved by Depot <br />management) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.