My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
13B - COUNCIL COMMITTEE REPORTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2006
>
08/21/2006
>
13B - COUNCIL COMMITTEE REPORTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:44:39 PM
Creation date
8/14/2006 4:59:18 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
13B
Date
8/21/2006
Destruction Year
2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CITY OF SANTA ANA <br />CITY COUNCIL COMMITTEE ON <br />MAIN STREET DEVELOPMENT <br />MINUTES <br />April 6, 2006 <br /> <br />CALLED TO ORDER <br />The meeting convened at 5:55 p.m. in City Hall, Room 831, 20 Civic Center <br />Plaza, Santa Ana, California. <br /> <br />ATTENDANCE <br />City Council Committee members present: Mayor Pro Tem Lisa Bist, <br />Councilmember Jose Solorio, and Councilmember Claudia Alvarez (6 p.m.) <br /> <br />Staff members present: Deputy City Manager Development Services Steve <br />Harding; Chief Assistant City Attorney Benjamin Kaufman; Planning and Building <br />Agency Executive Director Jay Trevino; Planning Manager Karen Haluza; <br />Assistant Planner II Lucy Linnaus; Economic Development Manager Linda <br />Summers; Redevelopment Assistant Danell Mercado; Senior Civil Engineer <br />Mindy Ly; Community Preservation Inspector Alvaro Nunez; and Police Officer <br />Campuzano. <br /> <br />( <br /> <br />AGENDA ITEMS <br /> <br />1. <br /> <br />APPROVAL OF MINUTES - March 2, 2006 <br /> <br />Action: <br /> <br />The minutes were approved 2:0 (Alvarez absent) <br /> <br />6. PROJECT UPDATES <br />Item taken out of order. <br /> <br />d) Construction of Archway Sion on South Main Street <br /> <br />A presentation was given by Simon Andres, Principal, Graphic Solutions. <br />Four preliminary concepts were shown to the Committee. The Committee <br />preferred option A, which resembles the original sign, and selected Red <br />Barn as their color choice for the sign and Falling Water for the steel <br />construction arch span. The lighting for the sign is fine as proposed. *+f:le <br />Committee f~lVorod lighting for tho steol construction arch span so that tho <br />sign doos not appoar as if it is floating. **The arch span does not need <br />additional lighting since there are two lights at the end of the post and <br />street lighting nearby as well. <br /> <br />* Amended at the June 1 meeting. ** <br /> <br />Main St. Dev. Committee Minutes <br /> <br />1 <br />138-5 <br /> <br />April 6, 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.