DOTY BROS.
<br />Construction Company
<br />COST PLUS RATES
<br />SOUTHERN CALIFORNIA
<br />COST PLUS RATES EFFECTIVE JULY 1, 2006 TO JUNE 30, 2007
<br />CRAFTSMAN/CLASS
<br />OPERATING ENGINEERS
<br />General Foreman, Appdx. A
<br />Foreman, Appdx. A
<br />Group 1, Appdx. A - Oiler
<br />Group 2, Appdx. A - Oiler
<br />Group 8, Appdx. A - Universal
<br />Group 10, Appdx. A - Mechanic
<br />Group 8, Appdx. B - Crane < 25 Tons
<br />Group 9, Appdx. B - Crane > 25 Tons
<br />Apprentice, Grp 8, Appdx A - Step 6 (90%)
<br />U.A. PIPEFITTERS/WELDERS
<br />INDUSTRIAL
<br />General Foreman
<br />Foreman
<br />Journeyman - Welder/Fitter
<br />Apprentice - Fifth Year
<br />SHORTLINE (LOCAL 250)
<br />Foreman
<br />Journeyman (Welder/Fitter)
<br />Welder Helper
<br />Pre -Helper
<br />UTILITY
<br />Foreman
<br />Welder
<br />Journeyman/Fuser
<br />Pipe Tradesman II
<br />ELECTRICIANS /INSIDE W/REMEN
<br />PAY STRAIGHT OVER DOUBLE
<br />CODE TIME TIME TIME
<br />OGF
<br />PAY
<br />STRAIGHT
<br />OVER
<br />DOUBLE
<br />CRAFTSMAN/CLASS
<br />CODE
<br />TIME
<br />TIME
<br />TIME
<br />CARPENTERS
<br />122.18
<br />OG2
<br />73.28
<br />99.03
<br />General Foreman
<br />CGF
<br />74.24
<br />104.03
<br />133.81
<br />Foreman
<br />CFM
<br />70.91
<br />99.02
<br />127.14
<br />Journeyman
<br />CJM
<br />67.57
<br />94.02
<br />120.47
<br />Shingler
<br />CSJ
<br />67.79
<br />94.34
<br />120.90
<br />Apprentice - 8th Period (90%)
<br />CA8
<br />62.28
<br />86.09
<br />109.88
<br />MILLWRIGHTS
<br />47.84
<br />65.58
<br />82.45
<br />UP2
<br />General Foreman
<br />CMG
<br />75.08
<br />105.27
<br />135.48
<br />Foreman
<br />CMF
<br />71.75
<br />100.27
<br />128.81
<br />Journeyman
<br />CMJ
<br />68.41
<br />95.27
<br />122.13
<br />Apprentice - 8th Period (95%)
<br />CM8
<br />65.60
<br />91.13
<br />116.64
<br />CEMENT MASONS
<br />Foreman
<br />MFM
<br />67.50
<br />89.60
<br />111.69
<br />Journeyman
<br />MJM
<br />64.99
<br />85.85
<br />106.69
<br />FRT Machine Operator
<br />MTO
<br />65.41
<br />86.47
<br />107.53
<br />Apprentice - 8th 6 Mos. (90%)
<br />MA8
<br />60.83
<br />79.59
<br />98.35
<br />LABORERS
<br />General Foreman
<br />LGF
<br />63.31
<br />85.32
<br />107.33
<br />Foreman
<br />LFM
<br />61.64
<br />82.81
<br />103.99
<br />Group 1 - General
<br />LG1
<br />54.72
<br />72.43
<br />90.14
<br />Group 2 - Wrapper > 6"
<br />LG2
<br />55.63
<br />73.81
<br />91.98
<br />Group 3 - PTO/Wrapper < 6"
<br />LG3
<br />56.55
<br />75.18
<br />93.81
<br />Group 4 - Pipe layer, C&S
<br />LG4
<br />59.13
<br />79.05
<br />98.99
<br />Group 5 - Blaster
<br />LG5
<br />59.72
<br />79.93
<br />100.15
<br />Apprentice - 6th Period (85%)
<br />LA6
<br />48.12
<br />65.30
<br />82.49
<br />TEAMSTERS
<br />General Foreman
<br />TGF
<br />66.57
<br />88.63
<br />110.70
<br />Foreman
<br />TFM
<br />64.91
<br />86.13
<br />107.36
<br />Group 2 - 2 Axle
<br />TG2
<br />61.97
<br />81.73
<br />101.48
<br />Group 3 - 3 Axle
<br />TG3
<br />62.18
<br />82.05
<br />101.91
<br />Group 5 - Working Truck Driver
<br />TG5
<br />62.40
<br />82.38
<br />102.36
<br />Group 6 - 4 or More Axle
<br />TG6
<br />62.60
<br />82.68
<br />102.75
<br />Group 9 - Lo -Bed
<br />TG9
<br />63.77
<br />84.43
<br />105.08
<br />Subjoumeyman - 4001-6000 Hrs.
<br />TA3
<br />46.59
<br />60.16
<br />73.73
<br />Group 12 - WTD BoomTrk Cert
<br />TBT
<br />65.66
<br />88.17
<br />110.70
<br />CRAFTSMAN/CLASS
<br />OPERATING ENGINEERS
<br />General Foreman, Appdx. A
<br />Foreman, Appdx. A
<br />Group 1, Appdx. A - Oiler
<br />Group 2, Appdx. A - Oiler
<br />Group 8, Appdx. A - Universal
<br />Group 10, Appdx. A - Mechanic
<br />Group 8, Appdx. B - Crane < 25 Tons
<br />Group 9, Appdx. B - Crane > 25 Tons
<br />Apprentice, Grp 8, Appdx A - Step 6 (90%)
<br />U.A. PIPEFITTERS/WELDERS
<br />INDUSTRIAL
<br />General Foreman
<br />Foreman
<br />Journeyman - Welder/Fitter
<br />Apprentice - Fifth Year
<br />SHORTLINE (LOCAL 250)
<br />Foreman
<br />Journeyman (Welder/Fitter)
<br />Welder Helper
<br />Pre -Helper
<br />UTILITY
<br />Foreman
<br />Welder
<br />Journeyman/Fuser
<br />Pipe Tradesman II
<br />ELECTRICIANS /INSIDE W/REMEN
<br />PAY STRAIGHT OVER DOUBLE
<br />CODE TIME TIME TIME
<br />OGF
<br />81.80
<br />111.81
<br />141.83
<br />OFM
<br />79.29
<br />108.06
<br />136.82
<br />OG1
<br />71.97
<br />97.08
<br />122.18
<br />OG2
<br />73.28
<br />99.03
<br />124.79
<br />OG8
<br />76.80
<br />104.31
<br />131.82
<br />OGA
<br />77.00
<br />104.61
<br />132.23
<br />068
<br />77.28
<br />105.03
<br />132.79
<br />069
<br />77.57
<br />105.47
<br />133.35
<br />OA6
<br />72.36
<br />98.37
<br />124.36
<br />IGF
<br />85.43
<br />119.54
<br />150.60
<br />IFM
<br />80.13
<br />111.59
<br />140.17
<br />IJM
<br />72.12
<br />99.58
<br />124.44
<br />IA5
<br />57.96
<br />80.27
<br />100.62
<br />SFM
<br />84.81
<br />118.37
<br />148.98
<br />SJM
<br />79.07
<br />109.75
<br />137.57
<br />SWH
<br />44.99
<br />61.69
<br />77.28
<br />SPH
<br />26.88
<br />37.11
<br />47.34
<br />UFM
<br />63.47
<br />89.04
<br />113.29
<br />UWJ
<br />56.91
<br />79.19
<br />100.15
<br />UFJ
<br />47.84
<br />65.58
<br />82.45
<br />UP2
<br />34.99
<br />46.57
<br />57.07
<br />(Rates subject to project location & employee base location)
<br />General Foreman
<br />EGF
<br />96.42
<br />135.57
<br />174.71
<br />Foreman
<br />EFM
<br />85.84
<br />119.69
<br />153.54
<br />Journeyman
<br />EJM
<br />78.96
<br />109.38
<br />139.79
<br />Apprentice - 10th Period (85%)
<br />EAO
<br />68.55
<br />94.42
<br />120.28
<br />PROJECT MANAGEMENT
<br />Project Manager
<br />MPM
<br />94.94
<br />129.87
<br />167.72
<br />Superintendent
<br />MSP
<br />85.18
<br />116.09
<br />149.94
<br />Project Engineer
<br />MPE
<br />66.11
<br />96.76
<br />127.41
<br />Apprentice Rates: Apprentice rates as listed above are the highest classification prior to journeyman full scale rates. Billing rate for Apprentice will be based on
<br />actual classification.
<br />Subsistence: $65.00/day
<br />Travel Time: Customer will be advised if travel time is applicable
<br />Overtime Rates: All hours outside regularly constituted shift shall be time and one half. Sundays and holidays shall be paid at double time. For Operating Engineers
<br />- first four (4) hours outside regular shift, and first twelve (12) hours on Saturday is time and one half; all additional hours at double time except holidays which are at
<br />triple time. Emergency "call out work" - Four (4) hour minimum for labor and equipment.
<br />Markup: Material, subcontractors, subsistence, and outside rentals (including fuel costs), will be billed cost plus sales tax where applicable, plus mark-up of 15%
<br />Boundaries of Southern California Cost Plus Rates: consists of the eleven (11) counties of Los Angeles, Inyo, Mono, Orange, Riverside, San Bernardino,
<br />Imperial, Ventura, Santa Barbara, San Luis Obispo, Kern and in addition: Richardson Rock, Santa Cruz Island, Arch Rock, San Nicholas Island, Catalina Island, San
<br />Clemente Island, San Miguel Island, Santa Barbara Island, Santa Rosa Island, Anacapa Island, including the Channel Islands Monument. Rate Scale does not
<br />include San Diego County.
<br />NOTE: Wage scales are in accordance with Associated General Contractors Master Labor Agreement, and are subject to change without notice. This rate
<br />sheet is not all inclusive; additional classifications available if required. (v2.0) CA C.L. 273024
<br />11232 E. Firestone Blvd., Norwalk, CA 90650 Phone: (562) 864-6566 Fax: (562) 864-6052 www.dotybros.com
<br />
|