Laserfiche WebLink
<br />I '. <br /> <br />( <br /> <br />DEMOLITION PROPOSED FEE SCHEDULE <br />CITY OF SANTA ANA CONTRACT SERVICES <br /> <br />NAME CLASSIFICATION HOURLY RATE <br />Willie A. Thomas OwnerlProoram Manager $ 170.00 <br />Walter Thomas Senior Proiect Manager $ 65.00 <br />Bernice Antimo Manaaer Quality CantroVContract Administrator $ 75.00 <br />Ferdv Ruano Site Superintendant $ 75.00 <br />William Grant Risk Manailement $ 75.00 <br />Dave Alexander Real Estate Soecialist $ 75.00 <br />Gil Bakshi Environmental Coordinator $ 62.00 <br />PC 400 Excavator Operator Ooerator $ 65.00 <br />345 Bl Excavator Operator Ooerator $ 65.00 <br />235 Excavator Operator Ooerator $ 65.00 <br />973 loader Operator Ooerator $ 62.00 <br />980 loader Operator Ooerator $ 62.00 <br />Foreman Foreman $ 48.00 <br />laborer laborer $ 48.00 <br />"Please Note - All rates are ''fully loaded" with overhead cost, insurance, etc. <br /> <br />EQUIPMENT RATES <br /> <br />( , <br /> <br />EQUIPMENT DESCRIPTION HOURLY RATE <br />8000 Ib class breaker $ 135.00 <br />Cateroillar 350/345 Thumb $ 25.00 <br />Cateroillar 365/375 Thumb $ 20.00 <br />Concrete Pulverizer $ 85.00 <br />Cateroillar 963 Track loader $ 165.00 <br />Cateroillar 980 Wheel loader $ 183.00 <br />Cateroillar 345/350 Excavator $ 195.00 <br />Hitachi EX400/450 Excavator $ 195.00 <br />Caterpillar 365 Excavator $ 258.00 <br />Caterpillar 375 Excavator $ 290.00 <br />235 C Excavator $ 190.00 <br />235 C Excavator wlbreaker $ 260.00 <br />320 Excavator $ 185.00 <br />320 Excavator wlbreaker $ 250.00 <br />325l Excavator $ 195.00 <br />325l wlbreaker $ 280.00 <br />365 Excavator $ 265.00 <br />365 Excavator w/breaker $ 395.00 <br />365 Excavator w/shear $ 360.00 <br />Water Truck $ 70.00 <br />Ten Wheel Dump Trucks $ 85.00 <br />Super Ten Dump Trucks $ 90.00 <br />Semi Trucks w/Flat bet $ 95.00 <br />Low Side Semi-End Dump Truck $ 95.00 <br />Hiilh Side Semi-End Dump Truck $ 105.00 <br />30 Ton Articulated Rock Truck $ 160.00 <br />35 Ton Articulated Rock Truck $ 170.00 <br /> <br />c <br /> <br />'-Please Note - All costs are based on an 8 hr day, overtime is an additional cost. <br />Any work that needs to be subcontracted, Thomas land Clearing Co. will provide bids directly. <br /> <br />EXHIBIT 8 <br />