Laserfiche WebLink
August 15, 2006 <br />CITY OF SANTA ANA <br />Attn: Mr. Tom Coughran <br />Water Resources Manager <br />Re: Labor and Equipment Rates <br />Description <br />Rates <br />LABOR RATES <br />Two Man Crew <br />$ 113.34 <br />Three Man Crew <br />$ 166.25 <br />Four Man Crew <br />$ 22322 <br />Additional Man <br />$ 55.51 <br />Additional Operator <br />$ 60.72 <br />Two Man Crew (OT) <br />$ 143.11 <br />Three Man Crew (OT) <br />$ 222.05 <br />Four Man Crew (OT) <br />$ 287.11 <br />Additional Man (OT) <br />$ 70.81 <br />Additional Operator (OT) <br />$ 77.48 <br />EQUIPMENT RATES <br />CAT 446 416, 426, 428, 436 Backhoe <br />$ 120.52 <br />Delivery Truck <br />$ 44.74 <br />CAT 325 Excavator, or equal <br />$ 205.72 <br />Kawasaki 80Z, 65Z Loader <br />$ 122.97 <br />Vacmaster Pothole Truck <br />$ 110.00 <br />Lowbed <br />$ 123.56 <br />Lowside End Dump <br />$ 102.96 <br />Ten Wheel Dump <br />$ 95.87 <br />Asphalt Roller <br />$ 132.00 <br />Skiploader <br />$ 93.14 <br />Concrete Saw <br />$ 134.20 <br />8'x 20' Shield (Daily) <br />$ 150.00 <br />4'x 20' Shield (Daily) <br />$ 125.00 <br />Light Plant (Daily) <br />$ 220.95 <br />Arrow Board (Daily) <br />$ 160.68 <br />Compaction Wheel (Daily) <br />$ 234.65 <br />Addco Message Board (Daily) <br />$ 304.34 <br />MATERIAL <br />Material at Cost plus 15% <br />Dump Fees at Cost plus 15% <br />