My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DELHI CENTER - 2006 CDBG
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
D (INACTIVE)
>
DELHI CENTER - 2006 CDBG
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2015 12:28:33 PM
Creation date
9/1/2006 4:28:34 PM
Metadata
Fields
Template:
Contracts
Company Name
Delhi Center
Contract #
A-2006-092-015
Agency
Community Development
Council Approval Date
4/17/2006
Expiration Date
6/30/2007
Insurance Exp Date
12/14/2006
Destruction Year
2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reducing Lead Hazards In The Home <br />lead <br />hrnp °operly <br />is ,trl increase <br />tile hazard to <br />Your Madly <br />by spreading <br />Pvetla more <br />at• 10,14 the <br />19,rtafrssir�aa,�t stiaea <br />as tr. <ineal t€a <br />rernove lead <br />a- z -ird s s i,fa, y. <br />In addition to day -to -day cleaning and good <br />nutrition: <br />You can temporarily reduce lead hazards <br />by taking actions such as repairing dam- <br />aged painted surfaces and planting grass <br />to cover soil with high lead levels. These <br />actions (called "interim controls ") are not <br />permanent solutions and will need ongo- <br />ing attention. <br />To permanently remove lead hazards, <br />you should hire a certified lead "abate- <br />ment" contractor. Abatement (or perma- <br />nent hazard elimination) methods <br />include removing, sealing, or enclosing <br />lead -based paint with special materials. <br />Just painting over the hazard with regular <br />paint is not permanent removal. <br />Always hire a person with special training <br />for correcting lead problems— someone <br />who knows how to do this work safely and <br />has the proper equipment to clean up <br />thoroughly. Certified contractors will employ <br />qualified workers and follow strict safety <br />rules as set by their state or by the federal <br />government. <br />Once the work is completed, dust cleanup <br />activities must be repeated until testing <br />indicates that lead dust levels are below the <br />following: <br />40 micrograms per square foot (pg/ft2) <br />for floors, including carpeted floors: <br />250 pg/ft2 for interior windows sills; and <br />400 Ng/ft2 for window troughs. <br />Call your state or local agency (see bottom <br />of page 1 1) for help in locating certified <br />professionals in your area and to see if <br />financial assistance is available. <br />
The URL can be used to link to this page
Your browser does not support the video tag.