Laserfiche WebLink
<br />B. The projects for the adjacent office building built in the 1960's relate to items that if not <br />addressed would threaten potential damage to both buildings. These are related to deferred <br />maintenance items that now require attention. The proposed projects are described below: <br /> <br />1. Replace gutters along the east side of the office building. The current gutters are <br />corroded and are contributing to a frequent flooding of the church hall and learning center <br />located in the basement of the office building. There is about 80 feet of gutter that needs <br />replacement. See Photo #6 below showing a segment of the gutter needing replacement. <br />The new gutters would be standard metal replacements. The estimated cost of this <br />project is $2,000. <br /> <br /> <br />Phot06 <br /> <br />Exhibit A <br />