Laserfiche WebLink
<br />Proposed Church of Messiah Grant Project Description <br /> <br />The estimated costs indicated below are not actual quotes from construction contractors, <br />therefore this is a preliminary Scope of Work and the scope of the project may be reduced or <br />increased pending a quote from a responsible contractor. The final scope of work is to be <br />approved by the City prior to construction. <br /> <br />The Church of the Messiah's "Project" includes several exterior preservation projects for the <br />historic 1886 church as well as repairs to the 1960's office building addition west of the church. <br /> <br />A. The projects for the historic church address neglected maintenance that is currently <br />accelerating the deterioration of the exterior fayade of the church. These deferred <br />maintenance projects are collectively raising concerns for the structural integrity of the <br />church and beginning to negatively impacting the overall aesthetics of the church. The <br />proposed projects for the historic church are described below: <br /> <br />1. Replace original copper fluted gutters that have corroded and no longer convey water to <br />the downspouts. See Photo # 1 below of a sample corroded gutter located on the south <br />side of the church. This project consists of replacing 60 feet of gutter in-kind. The gutter <br />would be custom manufactured by a local metals works shop to replicate the existing size <br />and shape. The preferred material would be copper again to match existing material. <br />There would also be some repairs to the eaves that have deteriorated as a result of the <br />faulty gutters. The estimated cost of this project is $9,700. <br /> <br />Photo 1 <br /> <br /> <br />Exhibit A <br />