My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-20-1996
Clerk
>
Minutes
>
CITY COUNCIL
>
1952-1999
>
1996
>
02-20-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2012 2:04:13 PM
Creation date
5/12/2003 2:13:14 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Minutes
Date
2/20/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BUSINESS CALENDAR <br /> <br />REPORTS <br /> <br />65.A. <br /> <br />4TH STREET IMPROVEMENTS <br /> <br />Desi Reyes and Amalia Almasy spoke in support of the proposed 4th Street improvements, <br />suggested Alternative 1 be expanded to include amenities listed in Alternatives 2 and 3, and <br />reported the Interstate-5 widening project created a storm drain problem on Eastside Street. <br /> <br />Mayor Pulido requested Larry Hitterdale's letter, written on behalf of the S addleback View <br />Neighborhood Association to express support for the 4th Street project with modifications, be <br />entered into the record. <br /> <br />Public Works Agency Executive Director Jim Ross discussed the components and costs of the <br />various street improvement alternatives. <br /> <br />Councilmember Moreno asked that the action include removal of parking on 4th Street between <br />Grand and French, and addition of electrical stubs (for future theme lighting) between Grand <br />Avenue and the I-5 Freeway during the undergrounding portion of the project. <br /> <br />Motion: 1. Approve. <br /> <br />Alternative 1 for 4th Street improvements which includes reconstruction of existing <br />pavement, curb, gutter, sidewalk, driveway approaches, and wheel chair ramps; <br />construction of a storm drain system; installation of new street lights between <br />French Street and the I-5 Freeway, theme lighting on 4th Street between French <br />Street and Grand Avenue, and theme sidewalk between French and Lacy Streets; <br />and undergrounding of overhead utility lines by utility companies per Underground <br />Utility District No. 31 at a total estimated cost of $3,200,000.00 - Public Works <br />Agency FILE RPT <br /> <br />2. Set for consideration at a future study session. <br /> <br />Additional street amenities as provided in Alternative 2, and inclusion of electrical <br />stubs to accommodate future theme lighting. <br /> <br />MOTION: McGuigan <br /> <br />SECOND: Richardson <br /> <br />VOTE: <br /> <br />AYES: <br /> <br />NOES: <br /> <br />Espinoza, Lutz, McGuigan, Mills, Moreno, Pulido, <br />Richardson <br />None <br /> <br />ABSENT: None <br /> <br />RECESSED - 7:32 P.M. <br /> <br />RECONVENED - 7:47 P.M. - All Councilmembers present <br /> <br />CITY COUNCIL MINUTES 50 <br /> <br />FEBRUARY 20, 1996 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.