My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tetra Tech, Inc. 5
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2019
>
Tetra Tech, Inc. 5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 4:09:26 PM
Creation date
9/8/2006 3:34:58 PM
Metadata
Fields
Template:
Contracts
Company Name
Tetra Tech, Inc
Contract #
A-2006-177
Agency
Public Works
Council Approval Date
7/17/2006
Insurance Exp Date
10/1/2009
Destruction Year
2019
Notes
Amended by A-2008-306, A-2010-010, A-2011-107, A-2013-111
Document Relationships
TETRA TECH INC. 5a
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2019
TETRA TECH, INC. 5b
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2019
TETRA TECH, INC. 5c
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2019
TETRA TECH, INC. 5d
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />STAFFING AND SUBCONSULTANTS <br />Tetra Tech has assembled a Project Team that possesses the knowledge, experience and enthusiasm <br />necessary to successfully complete the project. The Project Team is devoted to completing your <br />project within schedule and under budget, and not only meet, but exceed your expectations. The <br />following paragraphs summarize the qualifications of our key project staff. <br />Project Manager: Leading our Project Team is Mr. Tom Epperson, P.E. Mr. Epperson will <br />provide the overall project direction and coordination, technical oversight, quality management and <br />provide all day-to-day contact with the City staff. Mr. Epperson has been involved in a number of <br />projects for the City, as noted below: <br />• San Lorenzo Sewer Lift Station <br />• Elevated Tank Safety Modifications and Painting <br />• John Garthe Reservoir — Phase 2 <br />• Well No. 39 <br />• South Station Booster Pump Station <br />• Well No. 14 and No. 34 Modifications <br />In addition, Tom has been involved in the design and/or construction engineering of the following <br />pipeline replacement projects: <br />• City of Torrance Water Main Replacements (2005/06, 2002/03, 182nd and 2000) <br />• City of Anaheim Londerry Lane and Tumbleweed Road Water Main Replacement <br />• I-5 Waterline Relocations for the City of Anaheim <br />• City of Tustin Water Main Replacements (1995/96 and 1996/97) <br />• Broadway and Magnolia Trunk Sewer Replacements for Long Beach Water Department <br />• Relocations for Eastern Transportation Corridor for Silverado Contractors <br />• Oso/Trabuco Creek Crossing for Moulton Niguel Water District <br />• Cabot Road Pipelines for Moulton Niguel Water District <br />Mr. Mark Bush, P.E. will be the Project Engineer for the water/sewer main improvements. Mr. Bush <br />has been involved in almost all of the City projects (listed above) that Mr. Epperson has been the <br />Project Manager on. Mr. Bush has been the Project Engineer for the following similar projects: <br />Water Main Replacement Projects for City of Torrance <br />• Magnolia Trunk Sewer Replacement for Long Beach Water Department <br />• Pacific Park Recycled Water Pipelines for Moulton Niguel Water District <br />Ms. Erica Jenkins will be the Design Engineer for the water/sewer main improvements. Ms. Jenkins <br />has been the Design Engineer for the following similar projects: <br />• City of Torrance Water Main Replacements (2005/06, 2002/03, 182nd and 2000) <br />• City of Anaheim Londerry Lane and Tumbleweed Road Water Main Replacement <br />• I-5 Waterline Relocations for the City of Anaheim <br />• City of Tustin Water Main Replacements (1995/96 and 1996/97) <br />• Broadway and Magnolia Trunk Sewer Replacements for Long Beach Water Department <br />CITY OF SANTA ANA TETRA TECH, INC. <br />On -Call Engineering for Water and Sewer Main Improvements 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.