Laserfiche WebLink
24. TRAFFIC CONTROL <br />The Contractor shall conduct all work in a manner that will insure continuous traffic <br />flow on the street at all times. In situations where it is necessary to restrict traffic flow per <br />WATCH Handbook, the Contractor will contact the Director for approval. . <br />25. MISCELLANEOUS TRAFFIC DEVICES <br />Contractor shall provide all traffic control and miscellaneous traffic devices as may <br />be required for Routine and/or Extraordinary maintenance of this contract. <br />Signs used for handling traffic during the course of this contract shall be in <br />accordance with the "Work Area Traffic Control Handbook" (WATCH) published by <br />Building News, Inc., and made a part of these special provisions. The method in which <br />signs, barriers and other miscellaneous traffic devices are used during construction and/or <br />repair shall be in accordance with the publication mentioned. A copy of said publication is <br />on file in the Public Works Agency. <br />All signs shall be illuminated or reflectorized when they are used during hours of <br />darkness. All cones, pylons, barricades or posts used in the diversion of traffic shall be <br />provided with flashers, or other satisfactory illumination if in place during hours of darkness. <br />26. WORK BY CITY FORCES BECAUSE OF NONCONFORMANCE TO CONTRACT <br />Should the contractor fail to correct deficiencies or public nuisances that have been <br />created because of his operation, then these will be considered to be of an emergency nature <br />and cause the City to make the corrective work. Such work will be done on a force account <br />basis with an additional callout charge of $200.00 for each callouC. Said charges will be <br />billed to Contractor and deducted from Contractor's most recent pending invoice. <br />27. METHOD OF PAYMENT/MONTHLY REPORTS <br />The Contractor will be paid monthly in arears for work performed satisfactorily under <br />this contract. By the 10`h of each month the Contractor shall submit a detailed report of <br />maintenance performed and materials used in the prior month. This report shall be <br />accompanied by a billing in accordance with the contract price for the work performed, and <br />shall become the basis for payment. <br />28. WATER COST <br />The City shall bear the cost for water used in the sites covered by this contract as <br />billed on the regular monthly invoices by the City of Santa Ana Finance and Management <br />Services. <br />29. APPRENTICESHIP STANDARDS <br />8 <br />