My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TRITECH SOFTWARE SYSTEMS 2
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
T (INACTIVE)
>
TRITECH SOFTWARE SYSTEMS 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 2:41:48 PM
Creation date
10/9/2006 12:09:16 PM
Metadata
Fields
Template:
Contracts
Company Name
TRITECH SOFTWARE SYSTEMS 2
Contract #
A-2006-256
Agency
FIRE
Council Approval Date
9/5/2006
Insurance Exp Date
5/1/2007
Destruction Year
2015
Notes
Amended by A-2006-256A, A-2008-331
Document Relationships
TRITECH SOFTWARE SYSTEMS 2a
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\T (INACTIVE)
TRITECH SOFTWARE SYSTEMS 2b
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\T (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table of Contents <br />SECTION ONE — SUPPORT COMMUNICATIONS AND CONNECTIVITY..............................................................9 <br />A. TRITECH APPROVED METHODS OF CONNECTIVITY.............................................................................................................9 <br />1. Approved VPN Connectivity Methods and Clients..................................................................................... <br />................. 10 <br />2. Alternate Forms of'VPN Connectivity ............................................................................................................................ <br />14 <br />3. User Access and Passwords............................................................................................................................................14 <br />4. Discontinued Supportfor ISDN Connectivity ............................................................................................................... <br />16 <br />5. Back -Up Connectivity through RAS...............................................................................................................................16 <br />SECTION TWO — CUSTOMER RESPONSIBILITIES FOR INSTALLATION AND TRAINING <br />.........................19 <br />A. SUPPORT CONNECDVITY INSTALLATION............................................................................................................................ <br />19 <br />B. NETWORK CABLES............................................................................................................................................................... <br />19 <br />C. STAGING AREA.....................................................................................................................................................................20 <br />D. TRAINING SCHEDULE........................................................................................................................................................-.20 <br />E. TRAINING LOCATION........................................................................................................................................................... <br />21 <br />F. WINDOWS/MOUSE EXPERIENCE.......................................................................................................................................... <br />21 <br />G. TRAINING GROUND RULES.................................................................................................................................................. <br />22 <br />SECTION THREE - CABLE REQUIREMENTS — EIA/TIA 586B WIRING STANDARD.......................................23 <br />SECTION FOUR - PHYSICAL AND ENVIRONMENTAL REQUIREMENTS FOR COMPUTER ROOM ....... 25 <br />A. COMPUTER ROOM............................................................................. <br />B. ENVIRONMENTALSPECIFICATIONS.................................................. <br />C. ELECTRICAL AND PHYSICAL SPECIFICATIONS FOR EQUIPMENT..... <br />..25 <br />28 <br />APPENDIX A — ADDITIONAL VPN INFORMATION.....................................................................................................30 <br />Site Preparation and Support Connectivity Guide, V3.1 dated 8.12.2005 Page 3 of 13 <br />TliTech Software Systems - Confidential & Proprietary <br />
The URL can be used to link to this page
Your browser does not support the video tag.