My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TRITECH SOFTWARE SYSTEMS 2
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
T (INACTIVE)
>
TRITECH SOFTWARE SYSTEMS 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 2:41:48 PM
Creation date
10/9/2006 12:09:16 PM
Metadata
Fields
Template:
Contracts
Company Name
TRITECH SOFTWARE SYSTEMS 2
Contract #
A-2006-256
Agency
FIRE
Council Approval Date
9/5/2006
Insurance Exp Date
5/1/2007
Destruction Year
2015
Notes
Amended by A-2006-256A, A-2008-331
Document Relationships
TRITECH SOFTWARE SYSTEMS 2a
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\T (INACTIVE)
TRITECH SOFTWARE SYSTEMS 2b
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\T (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
External System <br />The Zetron 26 acts as a centralized controller to the model 26. The model 26 will <br />Interface <br />interface to the model 6. The interface between the two devices is not the <br />res onsibilit of TriTech software systems. <br />Protocols <br />The connection to the Zetron Model 26 is a serial part connection. The connection <br />will be made through a DB9 connector with a three wire transmit and receive with <br />ground. The transfer rate is between 4800 and 9600 Baud. The cable plugs into <br />the CAD/printer port on the Zetron Model 26 <br />WA <br />TriTech Tasks <br />. Perform requirements capturing and review of the suggested interface design. <br />• Provide an interface requirements document (IRD) which describes the <br />features and functionality of this interface. <br />• Provide system administration training for the configuration of the Zetron 26 <br />interface to TriTech VisiCAD <br />• Provide the initial installation and configuration of the Zetron 26 interface. <br />• Perform Acceptance Test Procedures. The subject matter of the ATP will be <br />the functionality described within the ]RD. <br />City Tasks <br />. Provide TriTech with the Model 6 vehicle positions. <br />• All hardware and configuration of the Zetron model 26 and 6 <br />• Review and sign off on all IRD's related to this interface. <br />• Participate with Acceptance Testing Procedures. <br />Comments <br />
The URL can be used to link to this page
Your browser does not support the video tag.