My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TRITECH SOFTWARE SYSTEMS 2
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
T (INACTIVE)
>
TRITECH SOFTWARE SYSTEMS 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 2:41:48 PM
Creation date
10/9/2006 12:09:16 PM
Metadata
Fields
Template:
Contracts
Company Name
TRITECH SOFTWARE SYSTEMS 2
Contract #
A-2006-256
Agency
FIRE
Council Approval Date
9/5/2006
Insurance Exp Date
5/1/2007
Destruction Year
2015
Notes
Amended by A-2006-256A, A-2008-331
Document Relationships
TRITECH SOFTWARE SYSTEMS 2a
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\T (INACTIVE)
TRITECH SOFTWARE SYSTEMS 2b
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\T (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Standard E-9-1-1 Interface <br />TriTech Software <br />Table of Contents <br />1. <br />Glossary....................................................................................................................4 <br />2. <br />Introduction.............................................................................................................. <br />4 <br />3. <br />Functionality..............................................................................................................4 <br />3.1 Use Case: Matching Attendant Stations to VisiCAD Workstation ........................4 <br />3.2 Use Case: Call -Taking Display Method...........................................................5 <br />3.3 Use Case: Populating Data into Emergency Call -Taking Screen .........................5 <br />3.4 Use Case: Wireless E911 Phase II Processing..................................................6 <br />3.5 Use Case: Detecting E911 Wireless Phase II Rebid..........................................6 <br />3.6 Use Case: Address Conversion......................................................................7 <br />3.7 Use Case: Heartbeats from E911 Controller....................................................7 <br />3.8 Use Case: Acknowledgement to E911 Controller..............................................7 <br />3.9 Use Case: Logging.......................................................................................7 <br />4. <br />Additional Design Constraints...................................................................................... <br />8 <br />5. <br />Workflow...................................................................................................................9 <br />6. <br />Implementation Tasks and Assumptions.......................................................................11 <br />7. <br />Disclaimer................................................................................................................11 <br />Interface Requirements Document 3 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.