My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2006-10-16
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2006
>
10/16/2006
>
FULL PACKET_2006-10-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:43:33 PM
Creation date
10/11/2006 11:57:08 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
10/16/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />OCTOBER 16, 2006 <br />TITLE: <br />AGRESDSENT TO UPGRADE <br />SUPERVISORY CONTROL AND <br />DATA ACQIIISITION 3YSTEffi <br />~~ <br />-~~ f <br />~' <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED <br />^ As Recommended <br />^ As Amended <br />^ Ordinance on 1 ~` Reading <br />^ Ordinance on 2n° Reading <br />^ Implementing Resolution <br />^ Set Public Hearing For_ <br />CONTINUED TO <br />FILE NUMBER <br />RECOMMENDED ACTION <br />Direct the City Attorney to prepare and authorize the City Manager and the <br />Clerk of the Council to execute an agreement with Transdyn, Inc. to <br />provide hardware and software upgrades to the Supervisory Control and Data <br />Acquisition System for the City's water production facilities for a fixed <br />fee of $950,000. <br />DISCUSSION <br />The City's water production facilities are controlled by a Supervisory <br />Control and Data Acquisition (SCADA) System. The system utilizes remote <br />programmable controllers at each water production site and a central <br />computer system located at the City Yard to remotely operate wells, pumps, <br />and reservoirs. Uninterrupted reliability and functionality of this <br />system is required to maintain operation of the water system. The <br />existing system was installed by Transdyn Controls, Inc. in 1992 and was <br />upgraded in 2000. <br />Due to the age and obsolescence of the existing hardware and software, the <br />programmable logic controllers located at each of the City's 38 water <br />production facilities must be replaced. New central computers located at <br />the City Yard are also required to provide fail-safe protection and <br />uninterrupted operation of the water system. <br />The proposed upgrade project also includes the installation of a radio <br />based communications system. This system will replace the current leased <br />telephone line system, providing increased reliability and will result in <br />an annual cost savings of approximately $40,000 in phone charges. <br />The current system provided by Transdyn has functioned since 1992 without <br />failure. Staff recommends that Transdyn Controls, Inc. be retained to <br />provide the required upgrades for a continued uninterruptible and <br />functional system. <br />25F-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.