(9) <br />CITY 4F SANTA ANA <br />that the Actual Construction Cost has exceeded, or will exceed, the Project Construction Budget for the <br />entire Project or any Project Component. <br />8. Monitor the contractor's safety program. Take necessary steps to ensure the jobsite conditions <br />are in compliance with OSHA regulations. <br />9. Maintain cost accounting records on authorized work performed under unit costs and additional <br />work performed on the basis of actual costs of labor and materials, or other work requiring accounting <br />records. <br />10. May develop and implement procedures for the review and processing of applications by <br />contractor for progress and final payments. CM is responsible to review and approve monthly progress <br />payments, and make recommendations for certification to the City for payment. <br />11. Act as an advisor to the city throughout construction and commission of the project. Determine <br />that the work of contractor is being performed in accordance with the contract documents. Make <br />recommendations to the City regarding special inspection or testing of work not in compliance with the <br />provisions of the contract documents. Subject to review by the City, reject work which does not conform <br />to the requirements of contract documents. <br />12. The individuals, Construction Manager, Inspector and Contract Administrator, shall not be <br />responsible for construction means, methods, techniques, sequences and procedures employed by the <br />contractor in the performance of the contract, and shall not be responsible for the failure of the contractor <br />to carry out work in accordance with the contract documents. However, any errors, omissions, or <br />discrepancies found in the Contract Documents shall be called to the attention of the City's Construction <br />Manager and clarified prior to construction starts. <br />13. Consult with the City when the contractor requests interpretations of the meaning and intent of <br />the drawings and specifications, and assist in achieving the resolution of problems, which may arise. <br />14. Record the progress of the project. Submit written daily and progress reports to the City. Keep <br />daily logs containing a record of weather, contractor's work on the site, number of workers and equipment, <br />work accomplished, problems encountered, and other relevant data. Make the log available to the City. <br />Prepare and send Weekly Statement of Working Days to the contractor. Monitor contractor's compliance <br />with labor code requirements. <br />15. Maintain, at the job site, records of contract documents including drawings, addenda, change <br />orders, and other modifications of plans and specifications marked to show all changes made during <br />construction. Maintain as -built records of underground utilities, including locations and depths of <br />trenches. At the completion of the project, deliver to the City all contract documents including as- built <br />records. <br />16. Evaluate the completion of the work of the contractor and make recommendations to the City <br />when work: is ready for final inspection. Assist the City in conducting final inspections. <br />17. Facilitate and coordinate inspection by representatives of other agencies. <br />18. Assist City with project budget tracking by funding source to ensure progress payment <br />applications are applied appropriately to correct funding sources. <br />