Laserfiche WebLink
<br />Ai+c< ~ Y\rI e n f- I <br /> <br />Change Order #1 Revision a <br />nnnnPage3 <br /> <br />17: Bnilding Dept. required working drawings and details: +$4,682.34 <br />Our original proposal did not include architectural planning, working drawings and details. Th <br />is the add for thc plans and details as required by the city of Santa Ana. <br /> <br />18: Bnilding Dept. required safety boUards: +$920.00 <br />Provide (2) required 4" concrete-steel bo11ards, installed to each side of the alley side exit dool <br />for safety. <br /> <br />19: Replace broken storefront glass panel: <br /> <br />+5596.16 <br /> <br />20: Delete business signage: <br />Delete the busincss signage as requested by the city. <br /> <br />. <S800.00> <br /> <br />Sub Total of this CbaDge Order: <br />OverheadIProfit 100/. <br />Total of this Change Order: <br /> <br />+$59,835.65 <br />+$5,983.56 <br />+$65,819.21 <br /> <br />CONTRACT SUMMARY: <br />Original Contract Amount: +$129,656.75 <br />Add for Performance Bond: +$4,140.00 <br />Add for Change Order #1: +$65,819.21 <br />Revised Contract Amount: +$199,615.96 <br />Amount Previously Paid: <$97,242.57> <br />Balance on Contract: +$102,373.39 <br /> <br /> <br />(YO'" (. <br /> <br />Dare <br />