Laserfiche WebLink
<br />FUNDING ANALYSIS <br />PROJECT NOS. 06-5012 AND 06-1021 <br />TRAFFIC SIGNAL INSTALLATION <br />AT TWO LOCATIONS <br /> <br />Construction Contract <br />Contract Administration <br />Inspection and Testing <br />Contingencies <br /> <br />$399,285 <br />19,887 <br />40,000 <br />39,928 <br /> <br />TOTAL ESTIMATED CONSTRUCTION COSTS <br /> <br />$499,100 <br /> <br />Exhibit 2 <br /> <br />238-4 <br /> <br />