My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMMUNICATIONS SUPPORT GROUP 7
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
C (INACTIVE)
>
COMMUNICATIONS SUPPORT GROUP 7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2015 4:25:42 PM
Creation date
11/15/2006 12:59:46 PM
Metadata
Fields
Template:
Contracts
Company Name
COMMUNICATIONS SUPPORT GROUP
Contract #
A-2006-277
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
10/16/2006
Expiration Date
10/31/2007
Insurance Exp Date
4/2/2007
Destruction Year
2016
Notes
Amended by A-2007-247, A-2008-276, A-2009-162, -01
Document Relationships
COMMUNICATIONS SUPPORT GROUP
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\C (INACTIVE)
COMMUNICATIONS SUPPORT GROUP (NEW MILLENIA INC) 7d
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\C (INACTIVE)
COMMUNICATIONS SUPPORT GROUP 7a
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\C (INACTIVE)
COMMUNICATIONS SUPPORT GROUP 7b
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\C (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br />PROOF OF PERFORMANCE TESTING <br />Perform a series of television signal level measurements to ascertain franchise <br />compliance. All testing shall be coordinated and supervised by Consultant. <br />A. Test shall be performed at the tap location under the existing conditions. <br />B. No accommodations shall be made to allow the City to correct problems found <br />prior to testing. <br />C. Prior to the commencement of testing, obtain the necessary calibration certificate <br />for all frequency/voltage sensitive equipment which will be used in the field <br />testing from the Grantee. <br />D. A 100' calibrated RG -59 jumper shall be used to connect the output of a <br />subscriber tap to the input of the measuring equipment. <br />II. An abbreviated proof of performance check shall be completed for each of the six (6) <br />Construction Phases. A minimum of five (5) different locations per Construction <br />Phase for the subscriber cable shall be selected and tested for compliance as set forth <br />in the following sections. <br />A. The following tests shall be performed at the headend prior to field testing and <br />at all subscriber network test points and field test locations. <br />Vistigal carrier levels <br />Aural carrier levels <br />Vistigal/Aural difference (calculated) <br />Sweep Peak -to -Valley <br />Carrier -to -Noise <br />Low frequency distortions ("Hum") <br />Composite Triple Beat <br />TASO rating of picture distortions on all channels <br />B. The following inspections shall be made at the headend: <br />Stand -by -carriers <br />Patch bays and switching bridges <br />Stand-by power generators <br />Radio carriage <br />Aural levels <br />Emergency override equipment <br />Installation of leased access equipment <br />Microwave and satellite receive equipment <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.