My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMMUNICATIONS SUPPORT GROUP 7
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
C (INACTIVE)
>
COMMUNICATIONS SUPPORT GROUP 7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2015 4:25:42 PM
Creation date
11/15/2006 12:59:46 PM
Metadata
Fields
Template:
Contracts
Company Name
COMMUNICATIONS SUPPORT GROUP
Contract #
A-2006-277
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
10/16/2006
Expiration Date
10/31/2007
Insurance Exp Date
4/2/2007
Destruction Year
2016
Notes
Amended by A-2007-247, A-2008-276, A-2009-162, -01
Document Relationships
COMMUNICATIONS SUPPORT GROUP
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\C (INACTIVE)
COMMUNICATIONS SUPPORT GROUP (NEW MILLENIA INC) 7d
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\C (INACTIVE)
COMMUNICATIONS SUPPORT GROUP 7a
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\C (INACTIVE)
COMMUNICATIONS SUPPORT GROUP 7b
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\C (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tests must be performed at the same locations each time and are performed <br />repeatedly in a 24-hour period in order to make comparisons between test <br />periods. At each test point, electrical tests must be made on at least eight <br />channels for a 450 MHz system or higher the size of Santa Ana's (Santa Ana is <br />now a 750MHz system). Subjective picture quality observations were made on <br />all channels at each test point. <br />In July, 2007 the City cable consultant, Communications Support Group (CSG), <br />VP participated in Time Warner's warmest month tests. Mr. Newell Whitfield, <br />Consulting Engineer oversaw the latter part of these tests (less the 24-hour <br />tests). Field tests were done in two consecutive days starting on July 26th , 2007 <br />by Time Warner and were completed on July 27th, 2007. Actual measurements <br />performed on both days were taken by representatives of Aldephia Cable and <br />witnessed by Mr. Whitfield. Observations were made at the system Headend <br />and at 5 locations through out the distribution system. <br />This year is the second round of three years of testing newly chosen test points. <br />A decision will be made to select five new test points that will continue to <br />represent a full span of the city beginning in 2009. The same test points are <br />typically chosen for performance consistency on an annual basis for 3 to 5 years. <br />It was the request of the city to begin choosing alternating new test points every <br />3 years. The test locations chosen are located on end of lines and at <br />geographical extremities of the cable system, which means, complete test point <br />coverage that encompasses the entire city. A map is attached for a visual of the <br />areas covered for this years test point locations. <br />Participants in initial meetings with Mr. Whitfield on July 26th from Time Warner <br />included Mr. Cliff Bridges, Technical Operations, Mr. Junior Lopez, Sweep <br />Technician, and Jesse Foster, Headend Engineer. <br />Communications Support Group, VP RPT2007.001 Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.