My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DMJM HARRIS - AECOM 3
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2020
>
DMJM HARRIS - AECOM 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2017 12:57:17 PM
Creation date
12/19/2006 1:18:41 PM
Metadata
Fields
Template:
Contracts
Company Name
DMJM HARRIS - AECOM
Contract #
A-2006-304
Agency
PUBLIC WORKS
Council Approval Date
11/20/2006
Insurance Exp Date
4/1/2009
Destruction Year
2020
Notes
Amended by A-2010-004
Document Relationships
AECOM (FORMERLY DMJM HARRIS) 3A - 2010
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
oJ�pTiory FpA <br />M <br />Bridge Structural Design Sen4ces <br />Construction Staging and Traffic Control <br />First Street has approximately 32,000 vehicles per day <br />crossing this bridge, therefore maintaining traffic will be <br />essential. As the existing southerly structure is only 19 -feet <br />wide it will not provide for the maintenance of traffic and <br />pedestrians in a single stage of work. We have developed a <br />two stage approach to resolve this issue, as described below <br />and shown in Figures 1 and 2. <br />Stage 1: To provide adequate room for one lane of traffic <br />in each direction plus pedestrians, the northerly structure <br />will require a partial demolition. By demolishing a 21 -foot <br />portion of the existing bridge, it will allow the construction of <br />a 49 -foot segment of the new northerly structure. During this <br />construction, a five-foot pedestrian walkway will be provided <br />separated by temporary k -rail from the vehicular traffic and <br />a chain link fence would be affixed to the existing guard rail <br />to provide additional safety at the edge of the bridge. <br />One lane of traffic in each direction will be maintained with <br />13 -foot lanes. Adequate distance exists to safely transition the <br />traffic to the south, and access will be maintained to adjacent <br />properties at all times. The mobile home park in the northeast <br />DMJM HARRIS I AECOM <br />quadrant will require 2 phased approach to construct the new <br />driveway to maintain access. <br />Additional work in this phase will include the retaining wall <br />construction adjacent to the aforementioned mobile home <br />park, the construction of the roadway approaches on the north <br />side of First Street, and the realignment of the maintenance <br />access road to the river. <br />Stage 2: Traffic will be transitioned onto the newly constructed <br />north half of the structure, and the pedestrians will use the <br />new northerly sidewalk. Ample room exists for 14 -foot lanes <br />to provide additional room for the vehicles adjacent to the <br />curb and the temporary k -rail. Access will be maintained to <br />all adjacent parcels during this stage of work. <br />The remaining 20 -feet of the existing northerly structure <br />will be demolished and the final portion of the northerly <br />structure will be constructed, along with the southerly 7.5 -foot <br />widening. The roadway and slope work for the approaches <br />will also be constructed on the south side of First Street. <br />1 -figure 7. DMJM Harris has developed a 2 -stage approach to resolve maintenance of traffic and provide a pedestrian <br />walkway <br />04601 324.5557 <br />
The URL can be used to link to this page
Your browser does not support the video tag.