My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SECURITY SOLUTIONS, INC. 2
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
S (INACTIVE)
>
SECURITY SOLUTIONS, INC. 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2015 2:56:34 PM
Creation date
12/19/2006 5:24:38 PM
Metadata
Fields
Template:
Contracts
Company Name
SECURITY SOLUTIONS, INC.
Contract #
A-2006-278
Agency
PUBLIC WORKS
Council Approval Date
10/16/2006
Insurance Exp Date
3/20/2007
Destruction Year
2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01025 —MEASUREMENT AND PAYMENT <br />PART1 — GENERAL <br />1.1 SCOPE <br />A. Payment for the various items of the Bid Sheets, as further specified herein, shall <br />include all compensation to be received by the CONTRACTOR for furnishing all tools, <br />equipment, supplies, and manufactured articles, and for all labor, operations, and <br />incidentals appurtenant to the items of work being described, as necessary to <br />complete the various items of the WORK all in accordance with the requirements of <br />the Contract Documents, including all appurtenances thereto, and including all costs <br />of compliance with the regulations of public agencies having jurisdiction, including <br />Safety and Health Requirements of the Occupational Safety and Health <br />Administration of the U.S. Department of Labor (OSHA). Payment will be made for <br />items as set forth in the Bid Schedule; all costs therefore shall be included in the <br />prices named in the Bid Schedule for the various appurtenant items of work. <br />1.2 PAYMENT SCHEDULE <br />A. Payments, in percent of the total contract amount indicated (less retainage), will be <br />made upon satisfactory completion of specific work items as follows: <br />C 47 <br />1. Approved Shop Drawing Submittals mac )mss+ 20% <br />2. Delivery of (all) Equipment to Site 20% <br />3. Preliminary Installation and Testing 20% <br />4. Field Start-up including Functional /Performance Testing 15% <br />5. 30 -Day Acceptance Test <br />15% <br />6. Delivery of all As -built Drawings, Final Documentation, <br />Spare Parts, Supplies, Tools and Test Equipment 10% <br />PART 2 — PRODUCTS (Not Used) <br />PART 3 — EXECUTION (Not Used) <br />- END OF SECTION - <br />City of Santa Ana Measurement and Payment <br />Security Management System Project Page 01025 -1 <br />SantaAna_SMS_01025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.