Laserfiche WebLink
4. Site Plans for West Reservoir, Well 21 and Well 30. The site drawings shall <br />include proposed location for all site equipment and conduit and wire <br />routing /details. The proposed conduit and wire installation shall include details of <br />the electrical and instrumentation conduits; especially the underground <br />installation, including the number, size and type of- conductors -in- each - conduit: - <br />5. Facility operations descriptions. <br />6. UPS and battery load calculations to show that the backup capacity and time <br />meet the specified requirements. <br />7. Panel, and cabinet layout drawings shall be prepared and they shall include the <br />following information: <br />a. Front, side, and plan views to scale. <br />b. Dimensions. <br />C. Arrangement (interior and exterior). <br />d. Mounting information, including conduit entrance locations. <br />e. Finish data. <br />f. Tag number and functional name of items mounted in and on panel, <br />console and cabinet. <br />g. Nameplate legend, which includes text, letter size, and colors to be used. <br />8. Installation, mounting, and anchoring details for all components and assemblies, <br />including access requirements and conduit connection or entry details. <br />- 9. Panel wiring and /or piping diagrams shall be prepared and integrate the field <br />wiring. They shall include the following information: <br />a. Name of panel. <br />b. Wiring and piping sizes and types. <br />C. Terminal strip numbers. <br />d. Functional name and manufacturer's designation for items to which wiring <br />and piping is connected. <br />e. Electrical control schematics in accordance with ANSI standards. <br />10. Field wiring and piping diagrams shall be prepared and be integrated with the <br />panel- wiring diagram. They shall include the following information: <br />City of Santa Ana Security Management System General Requirements <br />Security Management System Project Page 17010 -5 <br />SantaAna_SMS_17010 <br />