Laserfiche WebLink
D. Enclosures shall be sized to contain the equipment required to make the installation <br />complete and suitable for the intended purpose. Electrical wiring shall be in plastic <br />wireways and /or spot tied to present an orderly appearance. <br />E. All equipment shall be located and installed so that it will be readily accessible for <br />- operation and maintenance. The CITY reserves the right to require minor changes in <br />location of equipment prior to roughing in without incurring any additional costs or <br />charges. <br />F. The CONTRACTOR shall instruct installation personnel on any and all installation <br />requirements; thereafter, the technical field representative shall be readily available <br />by telephone to answer questions and supply clarification when needed by the <br />installation personnel. <br />G. Final Checks: After all installation and connection work has been completed, the <br />technical field representative shall check it all for correctness, verifying polarity of <br />electric power and signal connections, and all other similar details. The technical field <br />representative shall certify in writing to the CONTRACTOR that for each loop or <br />system checked out, all discrepancies have been corrected by the installation <br />personnel. <br />3.2 ENCLOSURE SIGNAL AND CONTROL CIRCUIT WIRING <br />A. Wiring Installation: All wires shall be run in plastic wireways except field wiring. <br />Wiring run from components on a swing -out panel to other components on a fixed <br />panel shall be made up in tied bundles. These bundles shall be tied with nylon wire <br />ties, and shall be secured to panels at both sides of the "hinge loop" so that the <br />conductors are not strained at the terminals. Signal and low voltage wiring shall be <br />run separately from power and 120 volt control wiring. <br />B. Conformance to the above wiring installation requirements shall be reflected by <br />details shown on the shop drawings for the ENGINEER'S review. <br />C. Wire Marking: Each signal, control, alarm, and indicating circuit conductor connected <br />to a given electrical point shall be designated by a single unique number which shall <br />be shown on all shop drawings. These numbers shall be marked on all conductors at <br />every terminal using white numbered wire markers which shall be plastic- coated cloth <br />covered with clear heat shrink tubing, or permanently marked heat - shrink plastic. <br />D. CONTRACTOR shall utilize a tag numbering system. Submit proposed numbering <br />system drawings to ENGINEER for approval prior to start of work. <br />13 SITE DESCRIPTIONS -- <br />A. West Reservoir: The overall dimensions of the West Reservoir site is approximately <br />200' x 340'. The site includes a reservoir (approximately 180' diameter x 32' tall), five <br />booster pumps, a well, a Motor Control Center (MCC), a chemical building and three <br />entrance gates. Houses and apartments border the South and East perimeters. <br />Private business lots border the North and West perimeters. The 120 VAC power <br />City of Santa Ana Security Management System Specific Requirements <br />Security Management System Project Page 17100 -13 <br />SantaAna_SMS -17100 <br />