My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
OLYMPIQUE FAÇADE ACCESS CONSULTING - 2006
Clerk
>
Contracts / Agreements
>
O
>
OLYMPIQUE FAÇADE ACCESS CONSULTING - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:25:25 PM
Creation date
1/10/2007 10:08:58 AM
Metadata
Fields
Template:
Contracts
Company Name
OLYMPIQUE FAĆADE ACCESS CONSULTING
Contract #
N-2006-122
Agency
Finance & Management Services
Expiration Date
6/30/2007
Insurance Exp Date
9/27/2007
Notes
Professional Expires 10/04/007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Santa Ana City Hall. OPOS Development Consulting Engagementdoc <br />of 4 <br />Company: <br />Project: <br /> <br />Page 4 <br /> <br />City of Santa Ana <br />Santa Ana City Haii <br />20 Civic Center Plaza <br />Santa Ana, CA 92701 <br /> <br />Project No. ODC.039-06 <br /> <br />The OPOS is intended to design an efficient and safe method for performing routine maintenance on <br />our buildings exterior fa,ade. <br /> <br />a, Requirements: <br />i. Architectural Drawings (CAD format): Site Plan, Roof Plans, Fioor Plans, Elevations, <br />SectiDns <br />II. Original Equipment Manufacturer/lnstaller ioad test certifications of all existing roof tie-back <br />anchors, davit pedestals and all other related suspension equipment. (These are usually <br />found in the original O&M package turned over by the Driginal GC) <br />b. Deliverables: <br />i. OPOS DDcument in triplicate. This will consist Df an 11X17 laminated dDcument which will <br />include the follDwing: <br />i. An iSDmetric plan view drawing of the buildings rDof with identification Df drops <br />zones, drop sequences, equipment configuratiDns and specific building <br />maintenance procedures, <br />ii. All provisions required to be included by Appendix A of Article 5 of the California <br />General Industry Safety Orders (Title 8, Appendix A of Article 5) <br />iii. Elevation Specific Ground Operations Access (boom lifts, extension poles etc.) <br />iv. CDA (Controlled Descent Apparatus) Access <br />v, Roof/Ground Rigged Suspended Scaffolding <br />vi, Site Work/Landscaping considerations <br /> <br />'CAD drafting seNices available if CAD mes are not available, Fees stan at $500.00 <br />"Engineering Services, if required, are not included in this Proposal. Fees start at $800.00 if original engineered <br />calculations of tile projects components is not available.. <br /> <br />3. Additional Services (as may be required> <br /> <br />a. Tie.Back Anchor Load Testing - (28 Anchors on Main Roan - if required <br />b. Engineering Calculations/Services - To verify anchor load capacity - if required, <br />c. CAD Design Services - To render original m,of plan and details--required. <br /> <br />$1,500.00 <br />$800.00 <br />$500.00 <br /> <br />TOTAL <br /> <br />$8,800.00 <br /> <br />OL YMPIQUE Fa~fldeAr.ces.'i Consulting@CaIIOSHASITNo.36 <br /> <br />Clienllnilials <br />
The URL can be used to link to this page
Your browser does not support the video tag.